Monitoring and controlling of substations are essential task for supplying healthy power to the consumers in this automated era. Depending on the voltage levels and end users, there are transmission or distribution substations those supply electrical power to various loads. Remote monitoring and control make these substations to be operated through wireless communication technologies like GSM, GPRS, Ethernet, etc.

Substations consist of various equipment like transformers, circuit breakers, relays, APFC panels, etc., and these equipment ought to be operated in such a way that the loads must be delivered safely with specified parameters. These parameters include voltage, current, frequency, power factor, temperature, and so on.

The following GSM based projects deal with substation monitoring and controlling aspects:

1. Microcontroller-Based Substation Monitoring and Control System with GSM Modem

This system acquires a remote substation’s parameters like voltage, current, frequency, etc., via GSM network using GSM modem or mobile. It allows the remote operator to operate relays, circuit breakers and buzzers, and facilitates the display of various parameters in the LCD that is interfaced to the microcontroller.
In this project a microcontroller acts as a central controlling device that accepts the inputs and correspondingly controls the outputs, as shown in the above figure. The microcontroller is programmed in such a way that it sends the input parameters in the field side to a remote GSM mobile through the GSM networks, periodically.

Similarly, it receives the control signals that are sent from the operators, and in accordance with those signals, it controls the relays and buzzers. At times when current exceeds their limits, the microcontroller automatically trips the circuit breakers and sends that information to the user by SMS.

Thus, this is a simple and low-cost type of GSM-based project that helps students to get a basic idea about the substation automation. With this system, a user can add more than two mobile numbers to receive and control the substation equipment.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: literature survey for substation equipment monitoring and controlling using gsm, www controlling of transformer from substation com, substation monitoring and controlling using gsm ppt, diac and triac, full report on controlling of transformer from substation, substation monitoring and controling by triac, consumer perception about retail outlet of indian oil company substation monitoring and controlling using gsm ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  ppt on design and implementation of intelligent campus security tracking system based on rfid and zigbee 7 16,053 09-02-2018, 02:20 PM
Last Post: udaya
  matlab code shadow detection and removal in colour images using matlab 2 2,262 12-01-2018, 01:24 PM
Last Post: dhanabhagya
Smile physics investigatory projects for class 12 cbse to set up a common base transistor circuit and to study its input and o 3 25,144 20-12-2017, 09:44 AM
Last Post: jaseela123d
  circuit diagram for attendance monitoring intelligent classroom 2 1,627 07-09-2017, 11:54 AM
Last Post: jaseela123d
  33 11kv substation ppt 5 7,725 24-07-2017, 04:28 PM
Last Post: jaseela123d
  vehicle tracking system using gsm and gps with arm 2 1,196 29-05-2017, 11:14 AM
Last Post: jaseela123d
  matlab code for digital watermarking using dct and dwt 5 4,423 19-05-2017, 02:59 PM
Last Post: jaseela123d
  triac based four step touch dimmer ppt 1 1,034 15-04-2017, 02:17 PM
Last Post: jaseela123d
  abstract hydraulic arm using syringe and motor pdf 1 1,192 11-04-2017, 11:26 AM
Last Post: jaseela123d
  sample dfd for student attendance monitoring system 1 1,264 05-04-2017, 02:22 PM
Last Post: jaseela123d

Forum Jump: