winter training bhel haridwar
#1

I(Shekhar tyagi) am a second year electrical engineering student from UPES Dehradun and I want to do a training in my winter vacation from BHEL Haridwar . So kindly inform me how can I apply for 1 month winter training and what is the procedure for aaplyinw in this company?
Thank you
Reply
#2
winter training bhel haridwar

Bharat Heavy Electricals Ltd.(BHEL) Haridwar has two manufacturing plants:-

not avl Heavy Electrical Equipment Plant (HEEP) and Central Foundry Forge Plant (CFFP).It also has a Pollution Control research Institute, PCRI.
not avl The Heavy Electricals Equipment Plant is one of the major manufacturing units of BHEL. The core business of HEEP includes design and manufacture of large size steam and gas turbines, turbo generators, heat exchangers, condensers and auxiliaries.
not avl The Central Foundry Forge Plant (CFFP) is engaged in manufacture of large size Castings and Forgings of various types of steels like alloy steels, creep resistant steel and supercritical grade steel.
not avl The Pollution Control Research Institute (PCRI) provides services in the field of Environmental Management and Pollution Control in the areas of air, water, noise and solid waste.
not avl HEEP & CFFP both have been awarded certificates forQuality Systems (ISO-9001:2008) Environment(ISO-14001) and Occupational Health & Safety (ISO-18001)
not avl HEEP is the only Public Sector unit in India to have won the CII-EXIM Bank Prize for Business Excellence (2006)
Reply
#3
Hallo,sir
I(Dhiraj kumar singh) am a 3rd year student mechanical engineering from JPIET MEERUT and I want to do a training my winter vocation from BHEL HARIDWAR.
So kindly inform me how can I apply for 1 month winter training and what is the
Procedure for applyinw in this company.
Thank you
Reply
#4
Hallo,sir
I(Balram Kumar poddar) am a 3rd year student mechanical engineering from JPIET MEERUT and I want to do a training my winter vocation from BHEL HARIDWAR.
So kindly inform me how can I apply for 1 month winter training and what is the
Procedure for applyinw in this company.
Thank you
Reply
#5
Bharat Heavy Electricals Limited (BHEL) owned by the Government of India, is an engineering and manufacturing company based in New Delhi, India. Established in 1964, BHEL is India's largest power plant equipment manufacturer. The company has been earning profits continuously since 1971-72 and paying dividends uninterruptedly since 1976-77.

It has been granted the prestigious Maharatna (big gem) status in 2013 by Govt of India for its outstanding performance.The elite list of maharatna contains another 6 behemoth PSU companies of India.
BHEL was established in 1964 Heavy Electricals (India) Limited was merged with BHEL in 1974.In 1982, it entered into power equipment, to reduce its dependence on the power sector. It developed the capability to produce a variety of electrical, electronic and mechanical equipments for all sectors, including transmission, transportation, oil and gas and other allied industries. In 1991, it was converted into a public limited company. By the end of 1996, the company had handed over 100 Electric Locomotives to Indian Railway and installed 250 Hydro-sets across India.

BHEL is engaged in the design, engineering, manufacturing, construction, testing, commissioning and servicing of a wide range of products, systems and services for the core sectors of the economy, viz. power, transmission, industry, transportation, renewable energy, oil & gas and defence.

It has a network of 17 manufacturing units, 2 repair units, 4 regional offices, 8 service centres, 8 overseas offices, 15 regional centres, 7 joint ventures, and infrastructure allowing it to execute more than 150 projects at sites across India and abroad. The company has established the capability to deliver 20,000 MW p.a. of power equipment to address the growing demand for power generation equipment.[3]

BHEL has retained its market leadership position during 2015-16 with 74% market share in the Power Sector. An improved focus on project execution enabled BHEL record its highest ever commissioning/synchronization of 15059 MW of power plants in domestic and international markets in 2015-16, marking a 59% increase over 2014-15. With the all-time high commissioning of 15000 MW in a single year FY2015-16, BHEL has exceeded 170 GW installed base of power generating equipments.

It also has been exporting its power and industry segment products and services for over 40 years. BHEL's global references are spread across over 76 countries across all the six continents of the world. The cumulative overseas installed capacity of BHEL manufactured power plants exceeds 9,000 MW across 21 countries including Malaysia, Oman, Iraq, UAE, Bhutan, Egypt and New Zealand. Their physical exports range from turnkey projects to after sales services.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: bhel haridwar winter training,
Popular Searches: bhel winter training form, winter training at bhel, bhel winter training application form pdf, winter training bhel, bhel training form for 2012 winter, winter internship at bhel haridwar, what is the procedure in winter training in bhel,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,643 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,712 04-12-2018, 09:27 AM
Last Post:
  dlw varanasi summer training report for electrical electronics branch 4 15,569 23-06-2018, 12:15 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,667 23-03-2018, 09:06 AM
Last Post: ritzi
  dlw varanasi summer training report for electrical electronics branch 6 12,927 06-11-2017, 10:05 AM
Last Post: jaseela123d
  maruti suzuki summer training report 2 2,376 04-11-2017, 09:20 AM
Last Post: [email protected]
  kibwezi teachers training college application forms 2 2,970 31-10-2017, 03:45 PM
Last Post: [email protected]
  general awareness on steam turbine manufacturing in bhel haridwar 2 1,324 27-10-2017, 03:10 PM
Last Post: Guest
  ccna summer training report pdf free 3 3,282 17-10-2017, 12:36 PM
Last Post: jaseela123d
  tuticorin thermal power station inplant training 10 4,041 17-10-2017, 11:43 AM
Last Post: jaseela123d

Forum Jump: