Power Blackout of 2003
#1

Power Blackout of 2003 : Lessons Learned

[attachment=17905]
Power Blackout of 2003


What were the “root causes” of the August 2003 power blackout event?
According to most published reports, two primary items led to the blackout:
First Energy’s “Lack of situational awareness” and
First Energy’s “Ineffective vegetation management”.




The “Bad News”
Verizon lost 5 switches in 2 “high-profile” Central Offices in Manhattan (West 50th St. and East 56th St.) due to standby generator failures
The high ambient temperature and humidity conditions resulted in decreased output from the turbine-driven generators; there were fuel system issues with 2 of the diesel generators
These events affected 276,000 customers.


The building blackout test is designed to ensure that:
All necessary building ac loads are on the generator’s standby bus
The generator is properly sized for the building
The generator’s “life support” systems (fuel pumps, oil cooler pumps, water pumps, start battery charger, etc.) are powered from the generator they are serving
These parameters are measured during periods of peak demand, and/or worst ambient environmental conditions
Critical office facilities and communications systems are powered from the generator
The office emergency lighting system is working properly.




Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: november 2003 civil engineering board passers, de noble 2003 on defination of job satisfaction, ms project 2003 critical, mailbox management exchange 2003, upcat results 2003, project 2003 converter, pappa transducer networks rtcbpa june 2003,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  SCADA FOR POWER SYSTEM AUTOMATION seminar paper 3 4,854 05-04-2016, 01:07 PM
Last Post: dhanabhagya
  Advanced Construction Methods for New Nuclear Power Plants seminar details 3 3,122 24-10-2014, 11:40 PM
Last Post: jaseela123d
  SURATGARH SUPER THERMAL POWER STATION seminar addict 2 2,183 05-09-2014, 10:36 PM
Last Post: seminar report asees
  Hydro power plants PPT seminar details 1 2,243 24-08-2014, 01:09 AM
Last Post: avantidarbhe
  A Modular Single-Phase Power-Factor-Correction Scheme With a Harmonic Filtering seminar details 2 1,934 26-07-2013, 04:44 PM
Last Post: computer topic
  Siemens AG, Power Generation Germany seminar addict 2 2,837 09-04-2013, 10:46 AM
Last Post: computer topic
  power management using load shedding. seminar addict 2 1,972 13-03-2013, 02:44 PM
Last Post: computer idea
  THERMAL POWER PLANT project uploader 1 2,555 18-01-2013, 12:22 PM
Last Post: seminar details
  SOLAR POWER TOWER full report seminar details 1 2,345 30-11-2012, 01:39 PM
Last Post: seminar details
  WIRELESS POWER TRANSMISSION project uploader 1 1,714 22-11-2012, 01:34 PM
Last Post: seminar details

Forum Jump: