THERMAL POWER PLANT
#1

THERMAL POWER PLANT
ACKOWLEDGEMET
I am highly grateful to the Mr. Sunil Kumar, HOD EE, IEC College of Engineering & Technology Gr. Noida, for providing this opportunity to carry out the four weeks industrial training at NATIONAL THERMAL POWER CORPORATION, DADRI
I express my sincere gratitude towards NATIONAL THERMAL POWER CORPORATION, DADRI for giving me an opportunity to undergo my summer training for 4 weeks. I also thanks to all the technicians, staffs for explaining all the practical aspects involved during my training.
As I completed my training want to thanks my faculties, Miss Naseem Zaidi Mam, Mr. Aizad Khursheed Sir, who were directly and indirectly involved in imparting me the various practical knowledge of the instruments installed at various locations in industries.
Overview of NTPC
NTPC was set up in the central sector in the 1975 in response to widening demand & supply gap with the main objective of planning, promoting & organizing an integrated development to thermal power in India. Ever since its inception, NTPC has never looked back and the corporation is treading steps of success one after the other. The only PSU to have achieved excellent rating in respect of MOU targets signed with Govt. of India each year. NTPC is poised to become a 40,000 MW gint corporation by the end of XI plan i.e. 2012 AD. Lighting up one fourth of the nation, NTPC has an installed capacity of 19,291 MW from its commitment to provide quality power; all the operating stations of NTPC located in the National Capital Region & western have acquired ISO 9002 certification. The service groups like Engineering, Contracts, materials and operation Services have also bagged the ISO 9001 certification. NTPC Dadri, Ramagundam, Vindhyachal and Korba station have also bagged ISO 14001 certification.Today NTPC contributes more than 3 / 5th of the total power generation in India.
NTPC Limited is the largest thermal power generating company of India. A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly owned company of the Government of India. NTPC ranked 317th in the ‘2009, Forbes Global 2000’ ranking of the world’s biggest companies. Within a span of 34 years , NTPC has emerged as a truly national power company, with power generating facilities in all the major regions of the country. With a current generating Capacity of 30,644 MW, NTPC has embarked on plans to become a 75,000 MW company by 2017. Apart from power generation from coal and gas, it has also diversified into hydro power, coal mining, power equipment manufacturing, oil and gas exploration, consultancy in the area of power plant constructions and power generation, power trading and distribution in the form of joint ventures with various other entities in India and abroad.
Station At Glance
NTPC dadri is model project of NTPC . also it tit the best project of NTPC also known as NCPS ( National capital power station ). Situated 60 kms away from Delhi in the District of gautam budh Nagar, Uttar Pradesh. The station has an installed capacity of 1669 MW of power – 840 MW from Coal based units and 829 MW Gas Based Station . the station is excelling in performance ever since it’s commercial operation . consistently in receipts of meritorious projectivity awards, the coal based units of the station stood first in the country in terms of PLF for the financial year 1999 – 2000 by generating an all time national high PLF of 96.12 % with the most modern O & M Practices. NTPC – Dadri is committed to generated clean and green Power. The Station also houses the first HVDC station of the country (GEP project) in association with centre for power efficiency and Environment protection (CENEEP) – NTPC & USAUID. The station has bagged ISO 14001 & ISO 9002 certification during the financial year 1999 – 2000, certified by Agency of International repute M/s DNV Netherlands M/s DNV Germany respectively
DADRI THERMAL POWER STATION
The National Capital Power Station [NCPS] has the distinction of being the country's only three in one project ; consisting of Stage-I 840 MW; Stage-II 490MW ( and 490 MW under construction) of coal based units , 829 MW gas based modules , and a 1,500 MW H.V.D.C. converter station {under the operational control of P.G.C.I.L. since October '93}. The stage-II (490MW*2) coal based units are scheduled in 2010 to meet the common wealth games power requirement. The commercial operation of Stage-II Unit-V 490 MW has been declared w.e.f 31.01.2010. Also work for Stage-II UNIT-VI 490MW is under full swings. Besides the station has the largest switchyard in the country with a power handling capacity of 4,500 MW
The station has the unique distinction of having Asia's first 100 percent dry ash extraction with transit ash storage silos and final storage place converted to an green ash mound . An Ash Technology park has also been set up to demonstrate the uses of ash which has become the point of attraction for the visitors.
Reply
#2
to get information about the topic thermal power plant. full report ppt and related topic refer the page link bellow

http://studentbank.in/report-thermal-power-plant

http://studentbank.in/report-solar-thermal-power-plant

http://studentbank.in/report-panki-therm...er-station

http://studentbank.in/report-thermal-pow...t-overview

http://studentbank.in/report-kota-super-...rial-visit
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: overview of thermal power plant, thermal power plant construction kw cost, thermal power plant costing, seminars on thermal power plant, thermal power plant in haryana, solar thermal power plant presentation, topic on thermal power plant pdfooks free download,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  SCADA FOR POWER SYSTEM AUTOMATION seminar paper 3 4,829 05-04-2016, 01:07 PM
Last Post: dhanabhagya
  Advanced Construction Methods for New Nuclear Power Plants seminar details 3 3,115 24-10-2014, 11:40 PM
Last Post: jaseela123d
  SURATGARH SUPER THERMAL POWER STATION seminar addict 2 2,173 05-09-2014, 10:36 PM
Last Post: seminar report asees
  Hydro power plants PPT seminar details 1 2,230 24-08-2014, 01:09 AM
Last Post: avantidarbhe
  A Modular Single-Phase Power-Factor-Correction Scheme With a Harmonic Filtering seminar details 2 1,923 26-07-2013, 04:44 PM
Last Post: computer topic
  Siemens AG, Power Generation Germany seminar addict 2 2,825 09-04-2013, 10:46 AM
Last Post: computer topic
  power management using load shedding. seminar addict 2 1,960 13-03-2013, 02:44 PM
Last Post: computer idea
  SOLAR POWER TOWER full report seminar details 1 2,334 30-11-2012, 01:39 PM
Last Post: seminar details
  WIRELESS POWER TRANSMISSION project uploader 1 1,700 22-11-2012, 01:34 PM
Last Post: seminar details
  Power Optimization and Management in Embedded Systems1 seminar paper 1 1,359 10-11-2012, 11:53 AM
Last Post: seminar details

Forum Jump: