Important..!About report on ntpc anta gerrating power plant is Not Asked Yet ? .. Please ASK FOR report on ntpc anta gerrating power plant BY CLICK HERE ....Our Team/forum members are ready to help you in free of cost...
Below is stripped version of available tagged cloud pages from web pages.....
Thank you...
Thread / Post Tags
Title: ntpc kanti muzaffarpur in plant training
Page Link: ntpc kanti muzaffarpur in plant training -
Posted By:
Created at: Tuesday 31st of March 2015 01:03:24 AM
Sir
I am Abhishek kumar s/o -Ramjatan paswan .I am doing B.tech (EE) from Punjab technology university. This summer provided to training in my college. This
Is my golden opportunity so, I want to training in your thermal power plant,
Duration of 6 weeks.so can I traning in plant. So please excepted my request.

Your obediently
Name - Abhishek kumar
Branch - B.tech EE
Semester - 4th
Mobile no. - 9525387860
Email id - [email protected]
..............etc

[:=Read Full Message Here=:]
Title: ntpc anta
Page Link: ntpc anta -
Posted By: meenanitesh
Created at: Saturday 09th of October 2010 05:12:42 PM
give me full report on ntpc anta..............etc

[:=Read Full Message Here=:]
Title: vocational training report at NTPC ANTA
Page Link: vocational training report at NTPC ANTA -
Posted By: msanjay79
Created at: Monday 29th of August 2011 09:39:17 PM
sir,
I need copy of report on vocational training at NTPC ANTA as soon as possible. It is urgent
..............etc

[:=Read Full Message Here=:]
Title: ntpc kanti muzaffarpur in plant training
Page Link: ntpc kanti muzaffarpur in plant training -
Posted By:
Created at: Saturday 23rd of May 2015 11:50:08 PM
ntpc kanti muzaffarpur training2016,
Sir..
. I am student of final year diploma in electrical....i want to training in ntpc kanti...sir so pls reply hurry up.................etc

[:=Read Full Message Here=:]
Title: ntpc gas power plant faridabad ppt
Page Link: ntpc gas power plant faridabad ppt -
Posted By:
Created at: Tuesday 27th of November 2012 03:39:29 AM
plz send me the ppt of NTPC FARIDABAD for mechanical engineering..............etc

[:=Read Full Message Here=:]
Title: ntpc anta plant information
Page Link: ntpc anta plant information -
Posted By: anish chug
Created at: Wednesday 09th of June 2010 11:58:43 AM
power generation process , auxillaries
detail..............etc

[:=Read Full Message Here=:]
Title: Electrical Power Generation using Steam Power Plant
Page Link: Electrical Power Generation using Steam Power Plant -
Posted By: mayank kohali
Created at: Friday 20th of November 2009 12:41:28 PM
sir,
i want the complete design of Electrical Power Generation using Steam Power Plant...............etc

[:=Read Full Message Here=:]
Title: power plant of NTPC Faridabad seminars ppt
Page Link: power plant of NTPC Faridabad seminars ppt -
Posted By:
Created at: Monday 01st of September 2014 05:48:27 AM
please help me to give ppt on ntpc faridabad plant..............etc

[:=Read Full Message Here=:]
Title: plant design for manufacturing plant of oxalic acid from molasses
Page Link: plant design for manufacturing plant of oxalic acid from molasses -
Posted By:
Created at: Monday 15th of April 2013 05:53:45 PM
Hello sir, Please give me detail information on :
1) the detail procedure with what are different parameters are used.
2) the reagents and operating conditions.
3) the yield and cost per ton for product.
..............etc

[:=Read Full Message Here=:]
Title: Industrial Training at NTPC Anta Gas power Plant full report
Page Link: Industrial Training at NTPC Anta Gas power Plant full report -
Posted By: seminar topics
Created at: Tuesday 30th of March 2010 12:11:35 AM
seminar report on ntpc anta, repot on ntpc anta pdf, report on ntpc anta gerrating power plant, ntpc antha working pdf, training at ntpc anta, pdf report for training of ntpc anta, ntpc anta summer training report pdf,
Presentation on Industrial Training at NTPC Anta Gas power Plant

Presented by:-
Dulara Sharma
Nand kishor


Topics to be covered:-
Introduction
Gas turbine
Generator
combined cycle process
Waste heat recovery boiler(WHRB)
Steam turbine
Generator & Transformer protection
Switchyard
Power evacuation







Introduction NTPC Ltd.
NTPC Limited is the largest power generating company of India.
A public sector company, it was incorporated in the year 1975 to accelerate power development in the country as a wholly..............etc

[:=Read Full Message Here=:]
Please report us any abuse/complaint to "omegawebs @ gmail.com"