ntpc kanti muzaffarpur in plant training
#1

Sir..
. I am student of final year diploma in electrical....i want to training in ntpc kanti...sir so pls reply hurry up...
Reply
#2
ntpc kanti muzaffarpur in plant training

Kanti Thermal Power Station is located in Kanti, Muzaffarpur,90 km away from Patna, the capital of the Indian state of Bihar.[1] It is managed by the Kanti Bijlee Utpadan Nigam Ltd (KBUN),-a joint venture between NTPC and BSEB Patna.[2] The majority shares of the Joint Venture Company is hold by NTPC,with NTPC 64.57% and BSEB 35.43%.The plant has not been functional since 2003, however three successful trial runs have paved way for commercial production of Electricity by the end of 2013.[3] In November 2013,Nitish Kumar said that another new 500MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in May 2015.

History
First started in 1985, Kanti Power Plant has an installed capacity of 110×2 MW. An additional capacity of 195×2 MW is being erected and is due to be completed by December 2014.Bihar is the most power stricken state of India; and in the issue of uplifting our current nation, an excellent and clean 'Thermal Power station' is a necessity. Kanti thermal Power Plant came into existence in 1985 with the efforts of then MP of Muzaffarpur

Operations
To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named ‘Vaishali Power Generating Company Limited (VPGCL)’ with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008. Present equity holding is 64.57% by NTPC & 35.43% by BSEB. The company is renovating and modernising the existing unit.The total cost of its renovation and modernization has been over Rs. 500 Crores.The station has an installed capacity of 2 X 110 MW. Both the units are under renovation and modernization.[9] An additional capacity of 220MWx2 is being erected and is due to be completed by December 2014.In March 2013, the renovation work of two old units was completed.MTPS started commercial production from November 1, 2013 by sypplying 94 MW.This is first generation in 11 years since 2002


Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: ntpc kanti muzaffarpur training2016,
Popular Searches: go java courier muzaffarpur bub, ntpc kanti training for btech 2nd year, kanti thermal power plant recruitment 2016, doordarshan muzaffarpur, www nemadi kendr, kanti thermal power plant muzaffarpur bihar training mechanical, report on ntpc anta gerrating power plant,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,635 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,709 04-12-2018, 09:27 AM
Last Post:
  dlw varanasi summer training report for electrical electronics branch 4 15,560 23-06-2018, 12:15 PM
Last Post: Guest
  applying summer internship in rourkela steel plant 2 13,276 11-04-2018, 04:10 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,665 23-03-2018, 09:06 AM
Last Post: ritzi
  in vijayawada thermal power plant internship details 1 1,745 21-02-2018, 07:30 PM
Last Post: Guest
  seminor report on solar chimney power plant 2 1,536 08-01-2018, 04:59 AM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 6 12,924 06-11-2017, 10:05 AM
Last Post: jaseela123d
  maruti suzuki summer training report 2 2,376 04-11-2017, 09:20 AM
Last Post: [email protected]
  kibwezi teachers training college application forms 2 2,970 31-10-2017, 03:45 PM
Last Post: [email protected]

Forum Jump: