Simulator Switching Card full report
#1

[attachment=14456]
INTRODUCTION
When an active process requires any external device for its proper execution, it makes a request for that device through some means. If that particular device is free and readily available for its use, the process will go on normally and there will be no delay in the execution of that particular requesting process. If in case the device requested by the process is temporarily unavailable for its use then, it introduces a delay in the execution of the process, thus increasing the number of clock cycles required for its execution.
A single process may request for its corresponding real device at a time or several requests may be made by several different processes for their particular external devices concurrently. The latter is a worst case wherein many processes may be left unserved resulting in ambiguity or may be served after a certain delay when the device becomes available for its use.
To avoid such a delay the software version/simulators of the real devices can be developed and made use of as the emulators for the real/external devices whenever they are unavailable. Even though such simulators are not fully capable of serving the full functionality as the real device for a process, it helps in reducing the delay and thus aids in faster execution of the process. These simulators will be opened on the serial channels of the computer and routed appropriately.
Here a question arises. What if the serial channel of the corresponding simulator is also unavailable? The flexibility here is that the simulator of any real device can be opened on any of the serial channels/ports in the computer. This results in no ambiguities, no delays even if many active processes requests for the real or simulators at the same time, as we can use any number of serial ports, creating them virtually, if not available physically in a computer.
To achieve such a scheme a routing and switching logic is required to select between various external devices or their simulators based on their availability. The external or simulator thus selected must be routed to the appropriate channel at the output side on which the request was made by the requesting process. To achieve such interface, a routing logic must be developed. To develop such a logical interface we make use of Complex Programmable Logic Device (CPLD) which will be programmed as per the logic required.
1.1 Scope
Stimulation for the project work “Simulator Switching Card" is due to its tremendous scope in the applications where time is an important constraint and any sort of delay in servicing the requesting processes is not accepted.
The project is aimed at providing instant service to any active process that requests for a device for its proper execution.
Programmable logic devices can be used to control and route the requested real device or its simulator to the corresponding process by which the request was made.
1.2 Objective of Study
Main objective is to cater the requirement of immediate servicing of the requests made by the active processes for which time is a rigid constraint.
To understand the capabilities and functioning of the Programmable Logic Devices, various interfaces that can be used to interface such a logic device to another data terminal and the different methods that can be used to control the functioning of the device.
1.3 Outcome of Project
If the requested real data is not currently available to service the process, then the simulated data will be instantly available for the requesting process for its use. Hence the process will be serviced in a reduced cycle time.
1.4 Development Specification
Platform : Windows XP, Windows 7
Language : VHDL
Package : XILINX
Library : CoolRunner-II
Simulator : Modelsim
1.5 Motivation
The motivation for developing this card is the requirement of low cost, high speed switching between the various peripheral devices. This is extremely important in military applications where the selection and routing of the requested devices must be done instantly. The processes cannot be made to wait in such critical cases. Hence a highly robust medium which is capable of operating over a wide range, able to serve any number of active processes and provides a provision to switch to the manual operation in case of the module failure must be developed to avoid uncertainties in applications were time is an important constraint .
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: epen pals for, switching network card, project report on atm simulator, 8086 simulator report, abstract for atm simulator project report,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
Simulator Switching Card full report - by smart paper boy - 15-07-2011, 09:41 AM

Possibly Related Threads...
Thread Author Replies Views Last Post
  FINGER PRINT BASED ELECTRONIC VOTING MACHINE full report project topics 60 51,191 11-05-2017, 10:43 AM
Last Post: jaseela123d
  AUTOMATIC BUS STATION ANNOUNCEMENT SYSTEM full report project report tiger 4 10,953 13-08-2016, 11:16 AM
Last Post: jaseela123d
  MICROCONTROLLER BASED DAM GATE CONTROL SYSTEM full report seminar class 13 17,338 19-06-2016, 07:53 PM
Last Post: Saianjana
  METAL DETECTOR full report project report tiger 14 23,896 12-03-2016, 01:51 PM
Last Post: seminar report asees
  PREPAID CARD FOR PETROL BUNK SYSTEM electronics seminars 7 5,973 27-02-2016, 02:15 PM
Last Post: seminar report asees
  Solar power plant full report seminar class 2 3,372 11-11-2015, 01:49 PM
Last Post: seminar report asees
  MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL full report project topics 49 58,218 10-09-2015, 03:18 PM
Last Post: seminar report asees
  RELAY CO-ORDINATION full report project report tiger 2 4,426 24-02-2015, 10:18 AM
Last Post: seminar report asees
  Speech based password enabled devices switching system seminar class 1 2,627 24-01-2015, 05:23 AM
Last Post: Guest
  COIN BASED MOBILE CHARGER full report seminar class 25 23,127 08-12-2014, 11:40 PM
Last Post: seminar report asees

Forum Jump: