work breakdown structure thermal power plant
#2

A thermal power plant is a power plant in which thermal energy is converted into electrical energy. In most parts of the world the turbine is driven by steam. The water heats up, turns into steam and rotates a steam turbine that drives an electric generator. After it passes through the turbine, the vapor is condensed in a condenser and recycled to where it was heated; This is known as a Rankine cycle. The biggest variation in the design of thermal power plants is due to the different sources of heat, the fossil fuel dominates here, although nuclear heat energy and solar heat energy are also used. Some prefer to use the term energy center because such facilities convert forms of thermal energy into electrical energy. Certain thermal plants are also designed to produce thermal energy for industrial purposes for district heating or water desalination, in addition to generating electricity.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ppt on hydraulic structure and water power engineering, information about structure of function of biogas plant, plant structure and function in wikipedia, seminar report on work breakdown structure, the structure and function of biogas plant, what is work in power plant for electronic engg, structure and function of biogas plant wikipedia,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
work breakdown structure thermal power plant - by Guest - 08-03-2015, 01:47 AM
RE: work breakdown structure thermal power plant - by jaseela123d - 11-04-2017, 10:12 AM

Possibly Related Threads...
Thread Author Replies Views Last Post
  solution manual of cl wadhwa power system pdf free download 8 23,523 25-11-2018, 10:48 PM
Last Post:
  applying summer internship in rourkela steel plant 2 13,412 11-04-2018, 04:10 PM
Last Post: Guest
  in vijayawada thermal power plant internship details 1 1,771 21-02-2018, 07:30 PM
Last Post: Guest
  solar water purification by using thermal method pdf file 2 13,199 12-02-2018, 03:44 PM
Last Post: dhanabhagya
  seminor report on solar chimney power plant 2 1,548 08-01-2018, 04:59 AM
Last Post: Guest
  mysore foods limited case study solution organizational structure 2 1,478 07-11-2017, 12:21 PM
Last Post: jaseela123d
  power saver for industries commercial establishments 3 2,240 06-11-2017, 09:37 AM
Last Post: jaseela123d
  tuticorin thermal power station inplant training 10 4,092 17-10-2017, 11:43 AM
Last Post: jaseela123d
  power resumption alarm circuit 2 1,393 16-10-2017, 09:48 PM
Last Post: Guest
  power generation by gravity ppt 5 1,549 13-09-2017, 12:30 PM
Last Post: jaseela123d

Forum Jump: