students ppt on bamboo reinforcement free download
#1

students ppt on bamboo reinfostudents ppt on bamboo reinforcement free downloadrcement free download
Reply
#2

Global demand for timber is increasing at a rapid pace, but the timber supply is running out. It has been found through research that bamboo can adequately replace wood and other materials in construction and other works. Industrially treated bamboo has shown great potential for the production of composite materials and components that are cost effective and can be used successfully for both structural and non-structural construction applications. Bamboo is one of the oldest traditional building materials used by mankind. The culm of bamboo, or stem, has become a wide diversity of products ranging from domestic household products to industrial applications. Bamboo is quite common for bridges, scaffolding and dwellings, but is usually used as a temporary outer structural material. In many overcrowded regions of the tropics, certain bamboos provide the right material that is cheap enough and abundant to meet the widespread need for affordable housing. With the advancement of science and technology and the scarce supply of wood, new methods are needed for processing bamboo to make it more durable and more usable in terms of building materials. Studies have been conducted on the basic properties and processing of bamboo in various types of composite products. Bamboo has several unique advantages like the ability to grow fast with a high yield and also matures quickly. In addition bamboo can be grown abundantly and also at a lower cost which makes it more economical.


Bamboo is mainly a tropical and subtropical plant that is suitable in China. Many studies find that physical and mechanical attributes vary with respect to diameter, length, age, type, position along the culms, and moisture content of the bamboo. The use of bamboo as reinforcement in concrete is a comparatively new concept, but has developed due to the increase in the demand for low-cost building material. One of the significant properties that would make bamboo an attractive alternative to reinforced concrete steel is its tensile strength. The tensile strength of bamboo is greater than most wood products which are advantageous, but is about half the tensile strength of the steel. Bamboo is mainly a tropical and subtropical plant that is suitable in many countries. The strength of the bamboo as a concrete reinforcement is much lower than the steel bar reinforcement. However, one of the merits is a cheap and replenishing agricultural resource and abundantly available. Due to excellent properties such as high strength to weight ratio, high tensile strength, shear strength and free cutting and processing, the bamboo as potential reinforcement material instead of steel is widely available in structural concrete elements. This paper presents some of the existing studies and technology of application of bamboo reinforced concrete elements in construction structures such as reinforced concrete columns of bamboo, beams, slabs and walls. 
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: seminar on bamboo as a building material ppt, bamboo reinforcement in soil, bamboo construction material ppt, soil reinforcement ppt, flexibility of bamboo in construction ppt download, bamboo as reinforcement, earth reinforcement ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
Music download free atm with an eye documentation and ppts 5 19,049 27-02-2019, 10:14 AM
Last Post:
  free download college alumni project in php 6 19,618 02-12-2018, 07:06 PM
Last Post:
  solution manual of cl wadhwa power system pdf free download 8 23,500 25-11-2018, 10:48 PM
Last Post:
  technical dumb charades free download related to electrical engineering 1 20,466 18-08-2018, 04:14 PM
Last Post: Guest
  free download source code of online college magazine 5 17,871 29-06-2018, 10:09 AM
Last Post: Guest
  mobile computing rajkamal pdf free download 3 18,666 15-06-2018, 07:35 PM
Last Post: susithra baskaran
  seminar report on 3d solar cells ppt paper presentation ppt seminars report on 3d solar cells ppt paper presentation ppt 5 43,179 15-04-2018, 08:39 AM
Last Post: Guest
  aradhya tutorials notes 4th sem cse free download 1 14,678 04-03-2018, 08:58 PM
Last Post: Guest
  fpga in space ppt free download 4 10,959 24-02-2018, 08:33 PM
Last Post: Guest
  free download college website project in html with source code 2 4,623 24-02-2018, 10:46 AM
Last Post: Guest

Forum Jump: