SKY HIGH INSTITUTE OF MANAGEMENT
#1

SKY HIGH INSTITUTE OF MANAGEMENT


.docx   SKY HIGH INSTITUTE OF MANAGEMENT.docx (Size: 1.26 MB / Downloads: 49)

INTRODUCTION
INTRODUCTION OF THE PROJECT:



Sky High Institute Of Management is among the most prestigious Business School. It was established in 1989 in London. Since then, it came a long way and have various branches in various parts of India. Sky High is currently ranked 8th among the best top 10 Management Institute in the world. Sky high is widely known for imparting quality education in various fields such as Management, Computers, Health Care, and Commerce.



FEASIBILITY STUDY:

All projects are feasible, given unlimited resources and infinite time. But the development of software is plagued by the scarcity of resources and difficulty delivery rates. It is both necessary and prudent to evaluate the feasibility of a project at the earliest possible time. Three key considerations are involved in the feasibility analysis.


Economic Feasibility:
This procedure is to determine the benefits and savings that are expected from a candidate system and compare them with the costs. If benefits outweigh costs, then the decision is made to design and implement the system. Otherwise, further justification or alteration in proposed system will have to be made if it is to have a chance of being approved.


Technical Feasibility:
Technical Feasibility centers on the existing computer system and to what extent it can support the proposed addition. If the budget is a serious constraint, then the project is judged not feasible.

Operational Feasibility:

People are inherently resistant to change, add computers have been known to facilitate change. It is understandable that the introduction of a candidate system requires special effort to educate, sell and train the staff on new ways of conducting business.


REQUIREMENT & ANALYSIS
Introduction:



After analyzing the requirements of the task to be performed, the next step is to analyze the problem and understand its context. The activity in the phase is studying the existing system and others is to understand the requirements and domain of the new system. Both the activities are equally important, but the first activity serves as a basis of giving the functional specifications and then successful design of the proposed system. Understanding the properties and requirements of a new system is more difficult and requires creative thinking and understanding of existing running system is also difficult, improper understanding of present system can lead diversion from solution.



Reply
#2
what is the entity diagram of sky high institute of management?
Reply
#3
SKY HIGH INSTITUTE OF MANAGEMENT PAPER PRESENTATION
Reply
#4
,m jk nmkn ikj fdvc fgv hjb hjfhn rtdgvjhi hfghvbtyd yxcusg dcsuydcgwsudsaiwbn67td87jhuijm]
]njhuftrtftrdcy8h]i9uhfrt f]

uu 7yrf 65ervb t56byguh
upload skyhigh institue of management project first no need of these nonscence

full of timewaste activities
Reply
#5

To get full information or details of SKY HIGH INSTITUTE OF MANAGEMENT please have a look on the pages

http://studentbank.in/report-sky-high-in...management

if you again feel trouble on SKY HIGH INSTITUTE OF MANAGEMENT please reply in that page and ask specific fields in SKY HIGH INSTITUTE OF MANAGEMENT
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: sky high institute of management about us, advantages of sky high institute of management, entities in sky high institute of management system, grd institute of management, sky high institute of management project download, sky high institute of management project documentation, sky high institute of management project docx,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  HIGH-DENSITY EMI FILTER DESIGN FOR DC-FED seminar details 0 947 06-06-2012, 02:36 PM
Last Post: seminar details
  ION CURRENT METHOD AS A HEAT SINK IN HIGH SPEED VLSI CHIPS seminar details 0 898 04-06-2012, 03:19 PM
Last Post: seminar details
  ULTRA- FAST ULTRA - HIGH INTENSE LASER seminar paper 0 1,144 16-03-2012, 12:07 PM
Last Post: seminar paper
  Charge Trapping Effects in High-k Transistors seminar paper 0 752 13-03-2012, 04:48 PM
Last Post: seminar paper
  tata sky seminar paper 0 724 13-03-2012, 03:03 PM
Last Post: seminar paper
  Cryptographic Security for a High-Performance Distributed File System seminar paper 0 908 12-03-2012, 04:07 PM
Last Post: seminar paper
  First Woman President of Government Subsidized Research Institute of Korea seminar paper 0 867 09-03-2012, 02:38 PM
Last Post: seminar paper
  MADANAPALLE INSTITUTE OF TECHNOLOGY AND SCIENCE MADANAPALLE seminar paper 0 729 07-03-2012, 03:15 PM
Last Post: seminar paper
  Energy-Delay Estimation Technique for High-Performance Microprocessor VLSI Adders project uploader 0 934 07-03-2012, 11:09 AM
Last Post: project uploader
  Wireline Quality Underwater Wireless Communication Using High Speed Acoustic Modems project uploader 0 885 23-02-2012, 10:52 AM
Last Post: project uploader

Forum Jump: