SCADA FOR POWER SYSTEM AUTOMATION
#1

SCADA FOR POWER SYSTEM AUTOMATION

ABSTRACT:
Automation of power distribution system has increasingly been adopted by power utilities worldwide in
recent years. As part of its efforts to provide a more reliable supply to the customer and to enhance
operational efficiency. The automation of the power system can be achieved by SCADA. It is a boon to
the automation concept of dynamic technology. SCADA refers to “SUPERVISORY CONTROL
&DATA ACQUISITION”.
This paper presents the approach adopted in implementing the SCADA system and the benefits
accrued through incorporating system. Electric power distribution system is an important part of electric
power system in delivery of electricity to consumers. Electric power utilities worldwide are increasingly
adopting the computer aided monitoring, control and management of electric power distribution system
to provide better service to electric consumers. Therefore research and development activities
worldwide are being carried out to automate the electric power distribution system utilizing recent
advancement in the area of information technology and data communication system. This paper reports
the present and past status of the research and development activities in the area of electric power
distribution automation both in developed as well as in developing countries. The information given in
this paper is useful to electric power distribution utilities and academicians involved in research and
development activities in the area of power distribution automation. Even public sectors like TNEB has
installed SCADA for monitor & control ninety-five substations in the CHENNAI metro for this, We are
trying to reproduce SCADA in a less paid form. This project explains the use of 8085 as RTU in power
system automation. Our ultimate aim is to reduce the cost but more user friendlier environment. This
may be a small step for us, we hope this may be a giant leap for the power sector. A computer based

SCADA system equipped with automated generation control function is proposed. To supervise and
control the generation and transmission system as well as to cater for their increasing sophistication in
system operation and coordination. In order to serve such a high number of RTU by a control centre and
to avoid any communication bottleneck at the master station, a distributed system approach is suggested.
Here two sets of dual computer system were installed at two geographically separated locations.
Reply
#2
to get information about the topic "power system automation and control" full report ppt and related topic refer the page link bellow


http://studentbank.in/report-scada-for-p...automation

http://studentbank.in/report-automation-...ect-report

http://studentbank.in/report-boiler-auto...nd-control
Reply
#3
I need report on scada in power system and automation please help out Sir/Mam
Reply
#4

To get full information or details of SCADA FOR POWER SYSTEM AUTOMATION please have a look on the pages

http://studentbank.in/report-scada-for-p...#pid170933

if you again feel trouble on SCADA FOR POWER SYSTEM AUTOMATION please reply in that page and ask specific fields in SCADA FOR POWER SYSTEM AUTOMATION
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: seminar topics on power system related to scada system, seminar on scada and power system automation, scada seminar topics,
Popular Searches: wireless hybrid scada for power station substation monitoring automation abstract, scada system, power system based projects for technical seminars on scada, scada and power system automation ppt, scada based college automation system abstract, seminar on scada and power system automation, ppt on electrical automation scada,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  A Paper Presentation on Software Development Automation by Computer Aided Software seminar paper 4 3,066 23-03-2016, 02:05 PM
Last Post: dhanabhagya
  Advanced Construction Methods for New Nuclear Power Plants seminar details 3 3,076 24-10-2014, 11:40 PM
Last Post: jaseela123d
  SURATGARH SUPER THERMAL POWER STATION seminar addict 2 2,150 05-09-2014, 10:36 PM
Last Post: seminar report asees
  Hydro power plants PPT seminar details 1 2,216 24-08-2014, 01:09 AM
Last Post: avantidarbhe
  A Modular Single-Phase Power-Factor-Correction Scheme With a Harmonic Filtering seminar details 2 1,903 26-07-2013, 04:44 PM
Last Post: computer topic
  Siemens AG, Power Generation Germany seminar addict 2 2,796 09-04-2013, 10:46 AM
Last Post: computer topic
  power management using load shedding. seminar addict 2 1,929 13-03-2013, 02:44 PM
Last Post: computer idea
  THERMAL POWER PLANT project uploader 1 2,526 18-01-2013, 12:22 PM
Last Post: seminar details
  SOLAR POWER TOWER full report seminar details 1 2,304 30-11-2012, 01:39 PM
Last Post: seminar details
  WIRELESS POWER TRANSMISSION project uploader 1 1,683 22-11-2012, 01:34 PM
Last Post: seminar details

Forum Jump: