Integrating line planning, timetabling, and vehicle scheduling: a customer-oriented h
#1

Integrating line planning, timetabling, and vehiclescheduling: a customer-oriented heuristic

Abstract Given an existing public transportation network, the classic planning
process in public transportation is as follows: In a first step, the lines are designed; in
a second step a timetable is calculated and finally the vehicle and crew schedules are
planned. The drawback of this sequence is that the main factors for the costs (i.e. the
number of vehicles and drivers needed) are only determined in a late stage of the
planning process.
We hence suggest to reorder the classic sequence of the planning steps: In our
new approach we first design the vehicle routes, then split them to lines and finally
calculate a (periodic) timetable. The advantage is that costs can be controlled during
the whole process while the objective in all three steps is customer-oriented.
In the paper we formulate an integrated model from which we develop this new
approach, discuss the complexity of the resulting problems, and present a heuristic
which we applied within a case study, optimizing the local bus system in Göttingen,
Germany.
1 Motivation and related literature
According to Desaulniers and Hickman (2007) the planning process in public transportation
includes several phases such as strategic planning (e.g. network design),
tactical planning (as line planning or timetabling), operational planning (e.g. vehicle
scheduling) and real time control. The usual sequence of these planning steps is
sketched in Fig. 1, see e.g. Ceder and Wilson (1986), Liebchen and Möhring (2007).
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: air vehicle planning system, difference between aggregate planning and scheduling, genetic algorithms for timetabling java, aggregate planning and master scheduling, timetabling system documentation, integrating technology and science,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Human Resource Planning at WIPRO seminar details 2 4,140 23-09-2013, 11:24 AM
Last Post: computer topic
  GPS & GSM Based Realtime Vehicle Tracking System. seminar paper 2 3,104 16-02-2013, 10:31 AM
Last Post: seminar details
  Bresenham Line Drawing Algorithm Circle Drawing & Polygon Filling project report helper 1 4,639 16-12-2012, 07:35 AM
Last Post: Guest
  Impact Of Atm On Customer Satisfaction seminar addict 1 2,395 08-12-2012, 05:18 PM
Last Post: seminar details
  A STUDY ON CUSTOMER SATISFACTION FOR BSNL PRODUCTS AND SERVICES seminar addict 2 2,831 08-12-2012, 05:15 PM
Last Post: seminar details
  Automated Guided Vehicle ( AGV ) seminar addict 1 1,892 24-11-2012, 12:15 PM
Last Post: seminar details
  Customer Satisfaction Towards Honda two wheelers seminar details 2 6,512 14-11-2012, 11:45 AM
Last Post: seminar details
  Types and Functions of Jigs and Fixtures project uploader 1 3,236 27-10-2012, 04:11 PM
Last Post: seminar details
  POWER LINE CARRIER COMMUNICATION ppt seminar details 1 6,720 19-10-2012, 02:03 PM
Last Post: seminar details
  AUTONOMOUS UNDERWATER VEHICLE seminar addict 1 1,899 04-10-2012, 02:26 PM
Last Post: seminar details

Forum Jump: