HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM
#1

PRESENTED BY:
ADARSH BAJPAI

[attachment=15065]
HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM
INTRODUCTION

It will consist of a transmitter and a receiver system . Receiver will be kept in the vehicles and transmitters would be installed on the road. It will not use any speed sensing device, instead four switches. Which could be operated by traffic Cops, limit 80, limit40,limit20 and no horn area, are provided . when ever these switches are pressed, they will transmit the corresponding alert message to the driver .
Receiver section will have an 2X16 lcd, which will display the alert message ,and a relay circuit having three relays. One relay to sound alarm to driver. One relay for the auto breaking circuit . and one relay to disable horn in the no horn area
BLOCK DIAGRAM OF TRANSMITTER
DESCRIPTION

TRANSMITTER:
Transmitter consists of a microcontroller and 433mhz transmitter module .capacitor c1 and r2 gives the reset pulse to microcontroller reset pinX1 along with two 33 pf capacitor gives required the clock pulse to microcontroller.
BLOCK DIAGRAM OF RECEIVER
DESCRIPTION
RECEIVER
:
Receiver consists of a microcontroller and 2×16 lcd device for display purpose. Capacitor c3 and r2 gives the required reset pulse to the reset pin1 of the microcontroller. Alternatively a reset switch is also provided to manually reset the microcontroller. Capacitor c4,c5 along with the crystal gives the clock pulses to microcontroller ,this serially received data is displayed on the lcd.
Alarm switch connected to p1.0 pin 13 will Data transmitted from the transmitter is received by the 433mhz receiver and output from this receiver is connected to pin 2 of the microcontroller .This serially received data is displayed on the lcd. Alarm switch connected to p1.0 pin 13 will switch off the alarm relay. Pin7,8&9 of the microcontroller controls the operation of the relay.
APPLICATIONS
Every year ,we find more and more road accidents due to increased traffic on the roads, and if you see the statistics ,you will find that the causalities are more every year than that of 1970 Indo -Pak war. Experts says, increased motorist population, long working hours, stressful life, are the major cause. The factors are beyond one’s control , but if we could alert the driver on the highway, could save the many prescious lives.
Reply
#2
to get information about the topic automated highway system full report ,ppt and related topic refer the page link bellow
http://studentbank.in/report-automated-highway-system

http://studentbank.in/report-control-des...way-system

http://studentbank.in/report-highway-spe...ing-system

http://studentbank.in/report-intelligent...d-highways
Reply
#3
pls send me full seminar report on this topic
Reply
#4
to get information about the topic HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM full report ppt and related topic refer the page link bellow

http://studentbank.in/report-abs-antiloc...ing-system
http://studentbank.in/report-automatic-b...abs?page=3
http://studentbank.in/report-highway-spe...ing-system
Reply
#5
otha podanga kuthi otha unga tholla kuthi thanga mudiyala da punda naan kekurathu inga illa da puda inna poolu nee web page vachikuraa sutha mudikunu web page ah close panni poda suthu
Reply
#6
To get full information or details of HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM please have a look on the pages



http://studentbank.in/report-highway-spe...ing-system

http://studentbank.in/report-control-des...way-system




if you again feel trouble on HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM please reply in that page and ask specific fields in HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM

Reply
#7
Rainbow 
(22-02-2012, 04:53 PM)pulkit choudhary Wrote: pls send me full seminar report on this topic

IdeaConfusedBlushBig Grin
Reply
#8

To get full information or details of HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM please have a look on the pages

http://studentbank.in/report-highway-spe...tem?page=2

if you again feel trouble on HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM please reply in that page and ask specific fields in HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: highway speed sensing automatic breaking system project, highway speed sensing controlling,
Popular Searches: antilog breaking system pdf, highway speed sensing controlling, vacuum breaking system research paper science direct, automatic hill station breaking ppt, http seminarprojects net t highway high speed sensing and automatic speed controlling system, project report on electromagnetic breaking system, automatic speed highway control,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Remote Controlling of Greenhouse Agriculture System by Microcontroller and Bluetooth smart paper boy 2 2,980 12-01-2018, 12:40 PM
Last Post: dhanabhagya
  Automatic Phase Selector (APS) computer science topics 7 15,187 19-07-2017, 09:00 PM
Last Post: Guest
  AUTOMATIC STREET LIGHT CONTROL WITH SENSOR TECHNOLOGY seminar class 2 11,350 22-05-2017, 11:07 AM
Last Post: yasminoth93
  DESIGN AND IMPLEMENTATION OF GOLAY ENCODER AND DECODER computer science crazy 2 22,583 26-08-2016, 03:46 PM
Last Post: anasek
  AUTOMATIC BUS STATION ANNOUNCEMENT SYSTEM full report project report tiger 4 10,506 13-08-2016, 11:16 AM
Last Post: jaseela123d
  SATELLITE REMOTE SENSING AND DISASTER MANAGEMENT smart paper boy 2 2,094 04-03-2016, 02:44 PM
Last Post: seminar report asees
  WIRE LESS SPEED CONTROL OF AC MOTOR (USING MOBILE) smart paper boy 6 10,888 24-02-2016, 02:05 PM
Last Post: seminar report asees
  AUTOMATIC STREET LIGHT CONTROL-EMBEDDED BASED PROJECT project topics 18 29,458 11-02-2016, 02:03 PM
Last Post: seminar report asees
  Wireless based Automatic dam water level control shutter open /closed with emergency smart paper boy 4 11,051 11-09-2015, 02:00 PM
Last Post: seminar report asees
  MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL full report project topics 49 57,560 10-09-2015, 03:18 PM
Last Post: seminar report asees

Forum Jump: