NATIONAL THERMAL POWER CORPORATION
#1

NATIONAL THERMAL POWER CORPORATION

[attachment=15917]

BRIEF NTPC-AN INTEGRATED POWER MAJOR
A journey towards excellence established in 7 Nov. 1975, NTPC limited, a premier sector enterprise, is India’s largest power utility with an installed capacity of 27,904MW through 26 power station including station operated under joint exploration, power distribution trading and also plans to enter into nuclear power development. NTPC plans to become a 50,000MW Company by 2012 and 75,000MW plus company by 2017. The company contributed 29.25% share of the total installed capacity of the nation including capacity and generation of joint venture companies
.

1.1 COMBINED CYCLE TECHNOLOGY:-
The year was 1985, government of India decided to effectively use the “sweetened natural gas”, which was to be made available by “GAIL” through cross-country HBJ gas pipe line NTPC was entrusted with a responsibility to set up gas based power project in Gujarat, Rajasthan and Utter Pradesh, NTPC submitted the feasibility reports for 3 gas based projects at Anta (Rajasthan), Auraiya (U.P) and Kawas (Gujarat).
The feasibility report of anta was approved by government of India in October, 1986. The land was simultaneously acquired, bhoomi poojan of the land to start the work performed on 16.01.1987 by the then CMD shri M.L. shishoo, and the charging of “construction power” was inaugurated.


1.2 MILE STONE:-
Govt. approval of feasibility report - 20.10.86
Bhoomi poojan - 16.01.87
Award of main plant turnkey contract - 24.08.87
Synchronization of GT-1 - 20.01.89
Synchronization of GT-2 - 04.03.89
Synchronization of GT-3 - 04.05.89
Synchronization of ST - 09.03.90
Location : anta in Baran district of Rajasthan
Total land : 390.75 acres.
Fuel : natural gas naphtha
Water source : KOTA RIGHT MAIN CANAL
Net plant output : 419.33 MW


1.3 SALIENT FEATURES OF ANTA
GAS TURBIN :89, TYPE 13D-2, ABB MAKE, 5TH STAGE REACTION TURBINE
GT COMPRESSR : 18TH ST; AGE AXU\IAL FLOW, REACTION BLADING
COMBUSTION CHAMBER :SINGLE SILO TYPE, DUAL FUEL FIRE BURNER
AIR INTAKE FILTER :SELF CLEANIN, SYNTHETIC PAPER, TOTAL 945 FILTERS IN THREE TIRES
BYPASS STACK :VERTICAL 25M. HIGH
WASTE HEAT RECOVERY Big GrinUAL PRESSURE, DOUBLEDRUM, UNFIRED, FORCED CIRCULLATION BOILER PRESSURE FLOW TEMP HP 62.70 BAR 163 T/HR 485℃
LP 5.5 BAR 39.1 T/HR 207℃
STEAM TURBINE :153.20MW, TANDEM COMPOUNDED , DOUBLE EXHAUTST, CONDENSING TYPE, SINGLE FLOW HORIZONTAL 25 STAGE HP TURBINES.
CONDENSOR Big GrinOUBLE PASS SURFACE CONDENSOR WITH STAINLESS STEEL TUBES, COOLING 13988M3.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: ppt of working process construction descibe in ntpc anta baranpower station,
Popular Searches: information technology applications corporation, international technology corporation, the telerobotics corporation, secure computing corporation, lafayette school corporation, taiheiyo engineering corporation, traffic control corporation,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  SCADA FOR POWER SYSTEM AUTOMATION seminar paper 3 4,854 05-04-2016, 01:07 PM
Last Post: dhanabhagya
  Advanced Construction Methods for New Nuclear Power Plants seminar details 3 3,123 24-10-2014, 11:40 PM
Last Post: jaseela123d
  SURATGARH SUPER THERMAL POWER STATION seminar addict 2 2,183 05-09-2014, 10:36 PM
Last Post: seminar report asees
  Hydro power plants PPT seminar details 1 2,243 24-08-2014, 01:09 AM
Last Post: avantidarbhe
  A Modular Single-Phase Power-Factor-Correction Scheme With a Harmonic Filtering seminar details 2 1,934 26-07-2013, 04:44 PM
Last Post: computer topic
  Siemens AG, Power Generation Germany seminar addict 2 2,837 09-04-2013, 10:46 AM
Last Post: computer topic
  power management using load shedding. seminar addict 2 1,972 13-03-2013, 02:44 PM
Last Post: computer idea
  THERMAL POWER PLANT project uploader 1 2,555 18-01-2013, 12:22 PM
Last Post: seminar details
  SOLAR POWER TOWER full report seminar details 1 2,348 30-11-2012, 01:39 PM
Last Post: seminar details
  WIRELESS POWER TRANSMISSION project uploader 1 1,714 22-11-2012, 01:34 PM
Last Post: seminar details

Forum Jump: