Development of a Single Phase Automatic Change-Over Switch
#1

Abstract
Most industrial and commercial processes are dependent on electrical power. In the event of power interruptions, the change-over from power supplied by a public utility to a generator is usually performed manually, often resulting in wasted time. Moreover, machine damage sometimes occurs because of human errors. These can cause significant financial losses. This paper presents the design and construction of an automatic phase change-over switch that switches electrical power supply from public supply to generator in the event of a power outage or insufficient voltage. The system uses an electronic control circuit involving integrated circuits, transistor and electromechanical devices.
Keywords: Relay, public supply voltage, generator, switching, electronic control circuit, transistor.
Introduction
Power instability in developing countries creates a need for automation of electrical power generation or alternative sources of power to back up the utility supply. This automation is required as the rate of power outage becomes predominantly high. Most industrial and commercial processes are dependent on power supply and if the processes of change-over are manual, serious time is not only wasted but also creates device or machine damage from human error during the change-over connections, which could bring massive losses.
The starting of the generator is done by a relay which switches the battery voltage to ignition coil of the generator while the main power relay switches the load to either public supply or generator. Fig 1 shows the general-ized block diagram of the system. The approach used in this work is the modular approach where the overall design was first broken into functional block diagrams, where each block in the diagram represents a section of the circuit that carries out a specific function. The functional block diagram of Fig. 1 also shows the interconnection between these blocks. Each section of the block is analyzed below.
A manual change-over switch consists of a manual change-over switch box, switch gear box and cut-out fuse or the connector fuse as described by Rocks and Mazur (1993). This change-over switch box separate the source between the generator and public supply, when there is power supply outage from public supply, someone has to go and change the line to generator. Thus when power supply is restored, someone has to put OFF the generator and then change the source line from generator to public supply.
In view of the above manual change-over switch system that involves manpower by using ones energy in starting the generator and switching over from public supply to generator and vice-versa when the supply is restored. The importance attached to cases of operation in hospitals and air ports in order to save life from generator as fast as possible makes it important for the design and construction of an automatic change-over switch which would solve the problem of manpower and the danger likely to be encountered changeover. The electronic control monitors the incoming public supply voltage and detects when the voltage drops below a level that electrical or electronics gadgets can function depending on the utility


Download full report
http://journal.au.edu/au_techno/2006/jul...o1_a10.pdf
Reply
#2
I need a comprehensive materials on single phase automatic change over switch.Also needed is the how to calculate the design of the circuit.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: disadvantages of a three phase automatic change over switch, list of components needed for the construction of automatic change over system, a mini project on dc motor control by using a single switch, automatic change over project, three phase automatic change over switch, automatic change over switch project, three phase automatic change over switch literature review,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Automatic Phase Selector (APS) computer science topics 7 15,646 19-07-2017, 09:00 PM
Last Post: Guest
  AUTOMATIC STREET LIGHT CONTROL WITH SENSOR TECHNOLOGY seminar class 2 11,749 22-05-2017, 11:07 AM
Last Post: yasminoth93
  AUTOMATIC BUS STATION ANNOUNCEMENT SYSTEM full report project report tiger 4 10,910 13-08-2016, 11:16 AM
Last Post: jaseela123d
  DEVELOPMENT OF SOFTWARE & HARDWARE FOR MICROCONTROLLER BASED SMART NOTICE BOARD (US Electrical Fan 3 3,871 09-08-2016, 11:27 AM
Last Post: jaseela123d
  Color Iris Recognition Using Quaternion Phase Correlation matlab project project topics 3 3,435 02-07-2016, 09:38 AM
Last Post: visalakshik
  HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM smart paper boy 7 13,773 16-03-2016, 03:02 PM
Last Post: dhanabhagya
  AUTOMATIC STREET LIGHT CONTROL-EMBEDDED BASED PROJECT project topics 18 30,407 11-02-2016, 02:03 PM
Last Post: seminar report asees
  Wireless based Automatic dam water level control shutter open /closed with emergency smart paper boy 4 11,457 11-09-2015, 02:00 PM
Last Post: seminar report asees
  MICROCONTROLLER BASED AUTOMATIC RAILWAY GATE CONTROL full report project topics 49 58,009 10-09-2015, 03:18 PM
Last Post: seminar report asees
  AUTOMATIC WATER LEVEL MONITORING SYSTEM computer science crazy 3 4,857 23-10-2014, 11:47 PM
Last Post: jaseela123d

Forum Jump: