TUNNELLING TECHNIQUES



DEFINITION

A definition of Conventional Tunnelling can be the construction of underground openings of any shape with a cyclic construction process of-
1. excavation, by using the drill and blast methods or mechanical excavators (except any full face TBM)
2. mucking
3. placement of the primary support elements such as-
-steel ribs or lattice girders
-soil or rock bolts
-sprayed or cast in situ concrete,






Principles of conventional tunnelling

Conventional Tunnelling is carried out in a cyclic execution process of repeated steps of excavation followed by the application of relevant primary support, both of which depend on existing ground conditions and ground behaviour. An experienced team of tunnel workers (miners), assisted by standard and/or special plant and equipment shall execute each individual cycle of tunnel construction.
The Conventional Tunnelling Method mainly using standard equipment and allowing access to the tunnel excavation face at almost any time is very flexible in situations or areas that require a change in the structural analysis or in the design and as a result of this, also require changes in the support measures.
The processes involved in the cyclic operation of conventional tunnelling are
1. Drilling
2. Charging
3. Blasting
4. Ventilation
5. Supporting
6. Loading/Muck removel
7. Transporting
CYCLE OF OPERATION IN TUNNELLING





SET OF EQUIPMENTS

A standard set of equipment for execution of conventional tunnelling may consist of following items
Drilling jumbo to drill holes for blasting, rock bolting, water and pressure release, grouting etc.
Road header or excavator in cases where blasting is not possible or not economic
Lifting platform allowing the miners to reach each part of the tunnel crown and of the tunnel face.
Lifting equipment for steels sets
Loader or excavator for loading excavated ground into dump trucks.
Dump trucks for hauling excavated ground.
Set of shotcrete manipulators for application of wet or dry shotcrete.
CROSS SECTIONS



SIGNIFICANCE

Conventional tunnelling enables :
A greater variability of the shapes.
Better knowledge of the ground by systematic exploratory drilling at the tunnel level ahead of the face.
Greater variability in the choice of excavation methods according to the ground conditions.
Easier optimisation of the primary support using observational method in special cases.
A greater variability in the choice of auxilliary construction methods according to the ground conditions




APPLICATION
Conventional tunnelling is specially convenient for:
Difficult ground with highly variable ground conditions.
Projects with highly variable shapes of cross sections.
Projects with a higher risk of water inflow under pressure.
Projects with difficult access.
Short tunnels.




LIMITATIONS
The conventional method for tunnelling entails the use of
Reply
#2
NICE AND USEFULL YOU MAY TRY
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: conventional multiflier, conventional current, tunneling methods pdf, conventional, single electron tunneling transistor pdf, tunneling equipments ppt, conventional loan,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  NanoTechnology (Download Full Seminar Report) Computer Science Clay 39 57,103 16-08-2018, 01:41 PM
Last Post: pradeepkumar.M
  magnetic refrigeration full report project report tiger 46 45,807 20-06-2018, 11:43 PM
Last Post: Guest
  TQM Total quality management full report project report tiger 5 14,145 18-09-2016, 08:41 PM
Last Post: velraj
  thermoacoustic refrigeration full report project report tiger 12 19,946 06-03-2015, 06:28 PM
Last Post: Guest
  the gurney flap full report project report tiger 1 3,608 04-12-2014, 02:02 PM
Last Post: pricemuzDet
  exhaust gas recirculation full report project report tiger 8 10,909 05-11-2014, 09:06 PM
Last Post: jaseela123d
  IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST full rep project report tiger 7 8,578 18-10-2014, 10:35 PM
Last Post: jaseela123d
  reverse engineering full report project report tiger 3 6,511 11-10-2014, 10:49 PM
Last Post: Guest
  sensotronic brake control full report computer science technology 13 24,142 07-10-2014, 10:01 PM
Last Post: seminar report asees
  anti lock braking system full report project report tiger 6 8,586 23-09-2014, 07:25 PM
Last Post: seminar report asees

Forum Jump: