bhel haridwar summer training ppt for block 3 turbine blade manufacturing
#1

bhel haridwar summer training ppt for block 3 turbine blade manufacturing
Reply
#2
(01-11-2012, 04:09 PM)Guest Wrote: bhel haridwar summer training ppt for block 3 turbine blade manufacturing

Reply
#3
report on turbine manufacturing for 1 month summer training.
hope u send me the download link.
Reply
#4
my
name is mayank.i have traning from bhel haridwar block 3 ..but still i
dont hve any report or ppt on traning . I need to traning report unable
to sign in me for downloading as soon as possible
Reply
#5
(01-11-2012, 04:09 PM)Guest Wrote: bhel haridwar summer training ppt for block 3 turbine blade manufacturing


bhel haridwar summer training ppt for block 3 turbine blade manufacturing

i want
Reply
#6
give me page link for download ppt on block 3
Reply
#7
bhel haridwar summer training ppt for block 3 turbine blade manufacturing

Bharat Heavy Electricals Ltd.(BHEL) Haridwar has two manufacturing plants:-

not avl Heavy Electrical Equipment Plant (HEEP) and Central Foundry Forge Plant (CFFP).It also has a Pollution Control research Institute, PCRI.
not avl The Heavy Electricals Equipment Plant is one of the major manufacturing units of BHEL. The core business of HEEP includes design and manufacture of large size steam and gas turbines, turbo generators, heat exchangers, condensers and auxiliaries.
not avl The Central Foundry Forge Plant (CFFP) is engaged in manufacture of large size Castings and Forgings of various types of steels like alloy steels, creep resistant steel and supercritical grade steel.
not avl The Pollution Control Research Institute (PCRI) provides services in the field of Environmental Management and Pollution Control in the areas of air, water, noise and solid waste.
not avl HEEP & CFFP both have been awarded certificates forQuality Systems (ISO-9001:2008) Environment(ISO-14001) and Occupational Health & Safety (ISO-18001)
not avl HEEP is the only Public Sector unit in India to have won the CII-EXIM Bank Prize for Business Excellence (2006)
Reply
#8

I need summer training report and ppt on turbine block 3
It's very urgent
So I hope that you will provide me this as soon as possible
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: bhel haridwar summer training ppt, bhel haridwar turbine block, project in turbine in bhel haridwar, ppt of manufacturing of steam turbina at bhel haridwar, project project bhel haridwar turbine shop block 3, traning report of bhel block 3, turbine bhel haridwar report,
Popular Searches: bhel locomotive manufacturing ppt, windmill blade manufacturing process, bhel haridwar industrial training, bhel block 2 project file, report ppt bhel turbine, summer intership block 2 bhel haridwar ppt, bhel haridwar fabrication block images,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,672 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,733 04-12-2018, 09:27 AM
Last Post:
  block diagram of low cost automatic gate light with musical bell 1 7,272 06-10-2018, 05:46 AM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 4 15,802 23-06-2018, 12:15 PM
Last Post: Guest
  seminar report on 3d solar cells ppt paper presentation ppt seminars report on 3d solar cells ppt paper presentation ppt 5 43,169 15-04-2018, 08:39 AM
Last Post: Guest
  applying summer internship in rourkela steel plant 2 13,400 11-04-2018, 04:10 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,688 23-03-2018, 09:06 AM
Last Post: ritzi
  binding wire manufacturing process project report 11 6,653 14-11-2017, 03:15 PM
Last Post: jaseela123d
  dlw varanasi summer training report for electrical electronics branch 6 13,059 06-11-2017, 10:05 AM
Last Post: jaseela123d
  maruti suzuki summer training report 2 2,389 04-11-2017, 09:20 AM
Last Post: [email protected]

Forum Jump: