Automatic Railway Gate Controller using FM Communications full report
#1

Abstract
This project is mainly based on the radio wave communication. The radio wave communication can be done either by A.M or F.M. The more desirable way of communication is F.M. because F.M is less susceptible to outside interference and noise (e.g., thunderstorms, nearby machinery) than is A.M. Such noise generally affects the amplitude of a radio wave but not its frequency, so an F.M signal remains virtually unchanged. F.M is also better able to transmit sounds in stereo than A.M. Commercial F.M broadcasting stations transmit their signals in the frequency range of 88 megahertz (MHz) The project is designed using F.M COMMUNICATION to avoid railway accidents happening at unattended railway gates, if implemented in spirit. This project utilizes two powerful IR transmitters and two receivers; one pair of transmitter and receiver is fixed at up side (from where the train comes) at a level higher than a human being in exact alignment and similarly the other pair is fixed at down side of the train direction. Sensors are fixed at 1km on both sides of the gate. We call the sensor along the train direction as Ëœforeside sensorâ„¢ and the other as Ëœaft side sensorâ„¢. When foreside receiver gets activated, the gate motor is turned on in one direction and the gate is closed and stays closed until the train crosses the gate and reaches aft side sensors. When aft side receiver gets activated motor turns in opposite direction and gate opens and motor stops. Buzzer will immediately sound at the fore side receiver activation and gate will close after 5 seconds, so giving time to drivers to clear gate area in order to avoid trapping between the gates and stop sound after the train has crossed.


Presented By:
Bonthapally Nikhil
0204-0435
CBIT, Hyd


read full report
http://nikhil.net63New%20Folder/Project%20Report.pdf
Reply
#2
please read http://studentbank.in/report-microcontro...ull-report and http://studentbank.in/report-automatic-r...ull-report http://studentbank.in/report-automatic-r...ull-report http://studentbank.in/report-automatic-r...ull-report for getting information related to AUTOMATIC RAILWAY GATE CONTROL system in different technology
Reply
#3
any 1 send the project report on automatic rail way gate controlUndecided
Reply
#4
actually i needed more information about this project.
Reply
#5
hello i need this report
Reply
#6
hi
the above posts are containing full report. you please go through the page link they given and download the report.
Reply
#7

PLES SEND ME THIS PROJECT AND GUIDE ME ID RAWATPOONAM20[at]GMAIL.COM
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: parking gate full project, automatic railway trac dedicating vickal, micro controller based automatic railway gate control ppt, abstract of automatic railway gate, pdf ppt of automatic railway gate using plc, solar power automatic railway gate controller pdf, fabrication of aotomatic railway gate oppening,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Trends in satellite communications and the role of optical free-space communications seminar class 2 15,073 23-12-2018, 02:07 PM
Last Post:
  Automatic Phase Selector (APS) computer science topics 7 15,662 19-07-2017, 09:00 PM
Last Post: Guest
  AUTOMATIC STREET LIGHT CONTROL WITH SENSOR TECHNOLOGY seminar class 2 11,761 22-05-2017, 11:07 AM
Last Post: yasminoth93
  FINGER PRINT BASED ELECTRONIC VOTING MACHINE full report project topics 60 50,952 11-05-2017, 10:43 AM
Last Post: jaseela123d
  AUTOMATIC BUS STATION ANNOUNCEMENT SYSTEM full report project report tiger 4 10,922 13-08-2016, 11:16 AM
Last Post: jaseela123d
  MICROCONTROLLER BASED DAM GATE CONTROL SYSTEM full report seminar class 13 17,309 19-06-2016, 07:53 PM
Last Post: Saianjana
  HIGHWAY SPEED SENSING AND AUTOMATIC BREAKING SYSTEM smart paper boy 7 13,788 16-03-2016, 03:02 PM
Last Post: dhanabhagya
  METAL DETECTOR full report project report tiger 14 23,823 12-03-2016, 01:51 PM
Last Post: seminar report asees
  AUTOMATIC STREET LIGHT CONTROL-EMBEDDED BASED PROJECT project topics 18 30,430 11-02-2016, 02:03 PM
Last Post: seminar report asees
  Solar power plant full report seminar class 2 3,370 11-11-2015, 01:49 PM
Last Post: seminar report asees

Forum Jump: