Industrial Training at NTPC Anta Gas power Plant full report
#5


[attachment=8126]

By:- RAJAT RAVI PALIWAL

ABOUT NTPC
NTPC has installed capacity of 29,394 MW.
15 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
The company has power generating facilities in all major regions of the country.
NTPC, was setup in 1975 world’s largest .
In Forbes list of World’s 2000 Largest Companies for the year 2007, NTPC occupies 411th place.


VISION:-

A world class integrated power major, powering India’s growth, with increasing global presence"

MISSION:-

"Develop and provide reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco – friendly technologies and contribute to society"

ABOUT NTPC NOIDA

SATELLITE COMMUNICATION DEP.
RND DEP.
HR DEP.
QUALITY CHECK DEP.

SATELLITE COMMUNICATION SYSTEM

It is also possible for satellites to communicate with other satellites
Communication can be by microwave or by optical laser


Communication frequencies

Microwave band terminology
L band 800 MHz - 2 GHz
S band 2-3 GHz
C band 3-6 GHz
X band 7-9 GHz
Ku band 10-17 GHz
Ka band 18-22 GHz


Basics: Advantages of Satellites

The advantages of satellite communication over terrestrial communication are:
The coverage area of a satellite greatly exceeds that of a terrestrial system.
Transmission cost of a satellite is independent of the distance from the center of the coverage area.
Satellite to Satellite communication is very precise.
Higher Bandwidths are available for use.


Basics: Disadvantages of Satellites

The disadvantages of satellite communication:
Launching satellites into orbit is costly.
Satellite bandwidth is gradually becoming used up.
There is a larger propagation delay in satellite communication than in terrestrial communication.

Major problems for satellites

Positioning in orbit
Stability
Power
Communications
Harsh environment



Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: report on ntpc anta gerrating power plant, training at ntpc anta, pdf report for training of ntpc anta, ntpc anta summer training report pdf, ntpc antha working pdf, kapil yadav, report on ntpc anta,
Popular Searches: british gas training, training in ntpc unchahar, anta power plant, training report of ntpc badarpur for electrical, ramagundam ntpc employes, training report of ntpc vindyanagar, ntpc tanda training,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: Industrial Training at NTPC Anta Gas power Plant full report - by seminar surveyer - 11-01-2011, 12:04 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  New Thread in Industrial Visit Report 0 550 21-06-2023, 12:59 AM
Last Post:
  New Thread in Industrial Visit Report 0 1,211 11-04-2023, 09:00 AM
Last Post:
  Summer internship in verka milk plant, Amritsar 0 1,550 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,487 21-02-2023, 02:05 PM
Last Post:
  New Thread in Industrial Visit Report 0 2,420 25-11-2022, 03:25 PM
Last Post:
  New Thread in Industrial Visit Report 0 1,738 20-11-2022, 04:32 PM
Last Post:
  New Thread in Industrial Visit Report 0 1,272 19-10-2022, 01:42 AM
Last Post:
  New Thread in Industrial Visit Report 0 1,037 18-10-2022, 10:51 PM
Last Post:
  New Thread in Industrial Visit Report 0 743 18-10-2022, 09:29 PM
Last Post:
  New Thread in Industrial Visit Report 0 518 18-10-2022, 08:58 PM
Last Post:

Forum Jump: