dlw varanasi summer training report for electrical electronics branch
#21
dlw varanasi summer training report for electrical electronics branch

Our Vision - "To be a world class manufacturer of reliable,cost-effective, state of the art Diesel - electric locomotives."

Our Mission -"We shall achieve our vision through

♦ Focus on quality for sustained and continuous improvement in reliability & performance on the product leading to
customer satisfaction.

♦ Developing core competence with due emphasis on innovation, human resource development and team work.

♦ Achieving environmental excellence by prevention of pollution, reduction of emissions, energy conservation and
preservation of natural resources.


Organizational Strength
A flagship production unit of Indian Railways offering complete range of products in its area of operation with annual turnover of over 2124 Crore.


State of the art Design and Manufacturing facility to manufacture 200 locomotives per annum with wide range of related products viz. DG Sets, Loco components and sub-assemblies.


Supply of spares required to maintain Diesel Locomotives and DG sets.


Unbeatable trail-blazing track record in providing cost-effective, eco-friendly and reliable solutions to ever increasing transportation needs for over four decades.


Fully geared to meet specific transportation needs by putting Price - Value - Technology equation perfectly right.


A large base of delighted customers among many countries viz. Myanmar, Sri Lanka, Malaysia, Vietnam, Bangladesh, Tanzania, Angola, to name a few, bearing testimony to product leadership in its category.

Our Quality Policy
Quality, Environment, Health & Safety Policy

Diesel Locomotive Works is a Production Unit of Indian Railways, manufacturing Diesel-electric Locomotives, Diesel Generating sets and their spares for Indian Railways, Non-Railway Customers and exports.


We are committed to achieve excellence by:

Continual improvement of the Quality, Environmental and Health & Safety - at- work - place performance.
Preventing pollution by all means including minimizing resource consumption and waste generation using cleaner technologies, material substitution and process changes.
Preventing all injuries and loss of property including environmental performance through continuous safety inspections.
Striving for compliance with all applicable Environmental and Health & Safety legislations.
Striving for "Right first time" and safe working practice through system improvement and training.
Enhancing Customer Satisfaction through improvement in reliability and performance of products.
Preventing all employees from occupational diseases and health hazards.
We shall:

Set objectives & targets and periodically monitor their progress through internal audit and management review.
Communicate Quality, Environment and Health & Safety policy to the employees and to make it available to the public on demand.
Periodically review our Quality, Environment and Health & Safety policy and management systems for continuing suitability, adequacy and effectiveness.

Environmental/Social Orientation
Environmental Management

A healthy and congenial environment alone can produce and promote healthy citizens � we firmly believe. In order to

have a clean and green DLW, we have a well defined integrated environmental policy. This promotes an ever motivated

work-force, giving rise to products of International standard.

Environmental Objectives:
Reduction in Resource consumption

Reduction in Fire Emergencies -10% every year

Improvement in Emergency preparedness

Monitoring of water & ambient air periodically
Sewage Treatment Plant:

STP is mainly concerned with the treatment of domestic and industrial sewage. The treated water is used for irrigation

purpose up to nearby Lohta farm and kitchen gardening at DLW premises.The digested sludge is sent to sludge drying

beds, later to be used as manure. Methane gas mainly produced from the digester is

collected in the gas holder and supplied to the canteen.

Industrial Effluent Treatment Plant:

IETP does the job of treatment of industrial effluent

which mainly contains oil and grease . The treated water is sent to nearby villages for

farming and kitchen gardening at DLW.

Chromium Treatment Plant:

CTP deals with the treatment of effluents from CRP shop (Chrome Plating Shop). This has varying concentration of

hexavalent chromium. This hexavalent chromium is converted into trivalent chromium in

acidic condition and is precipitated. This sludge, after drying in the form of cakes, is

stored in a covered tank made of concrete. Water after treatment is used for irrigation in

nearby villages.


iii) Occupational Health & Safety Management:

DLW is OHSAS-18001 certified since September, 2005. OHSAS formulates the work-procedures, defines hazards,

assesses the risks involved therein and generates awareness regarding use of personal protective equipments at

workplace. This enhances safety at work-place, reduces chances of accidents and

makes workers more confident leading to increase in productivity.

OHS Objectives:
Reduction in HOD cases -10% every year

Improvement in use of PPEs (100%)

Recharging of Ground water

Monitoring of water & ambient air periodically

Procedure of Registration with COS/DLW Varanasi
Procedure of Registration with COS/DLW Varanasi


The procedure for registration of firms for supply of stores to Diesel Locomotive Works, Varanasi, are detailed below :-

The essence of purchasing is rational source selection. The registration of firms as approved suppliers is done after assessing the capacity and capability of the firms.

·The application forms for registration are available on sale from the registration Section of the office of the Controller of Stores, DLW, Varanasi.


·The cost of application form is fixed as Rs. 100/- and if the application form is required to be sent by post, a sum of Rs. 25/- is to be paid by the firm towards Postal charges. For SSI units registered with NSIC, the application form will be issued free of cost. However the postal charge of Rs. 25.00 only is collected, if the application form is required by post. Automatic registration (provided all the documents are furnished) will be done for SSI units registered with NSIC.


·The application forms completed in all aspects along with supporting documents like Balance sheet for the last three years, Banker�s Cash credit Limit certificate in original, Valid Copy of ISO-9000 certificate etc. are to be submitted in Registration section of the Controller of Stores, DLW, Varanasi. Incomplete application are liable to be Summarily rejected.


·To expedite registration, new firms seeking registration are asked to register with the Zonal Railway covering the place where the firm is situated and then approach DLW for registration with a copy of enlistment issued by the Zonal Railway concerned.


·Dy.CMM/Indg. Recommends the case of vendor for registration to CMM/P for approval, if firm being approved, the vendor is put on the list of registered vendor of DLW by allotting a registration No. The registration will be on provisional basis for one year.


·Monetary limits are carefully fixed, keeping in view of the Banker�s reports, capacity and capability of the firm and other financial information’s indicated in the Balance sheet, Profit and Loss statements.


·For renewal of registration the vendors are required to apply for renewal past performance with DLW is main criteria for the renewal. Vendor are required to apply for renewal of registration along with past performance with DLW for the last three years. If the case is found in order, the same is put to CMM/P for renewal of registration for further two years. It may be noted that it is the responsibility of the firm to get them renewed before the expiry of registration.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: summer training report of ece from dlw varanasi, summer training report on tel exchange in dlw, d l w training file pdf for electronic diploma holders, dlw varanasi summer training report electrical, http seminarprojects org t dlw varanasi summer training report for electrical electronics branch, dlw varanasi summer training report, dlw samar trening farm,
Popular Searches: training at dlw 2015 summer, project report dlw varanasi pdf, documents required for summer internship 2016 of mechanical engineering in dlw varanasi, dlw varanasi mechanical branch summer training sheet 2016, dlw project report, training report of dlw varanasi for mechanical engg, training report on dlw varanasi,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: dlw varanasi summer training report for electrical electronics branch - by seminar report asees - 31-07-2015, 02:25 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,676 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,735 04-12-2018, 09:27 AM
Last Post:
  technical dumb charades free download related to electrical engineering 1 20,477 18-08-2018, 04:14 PM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 4 15,818 23-06-2018, 12:15 PM
Last Post: Guest
  seminar report on 3d solar cells ppt paper presentation ppt seminars report on 3d solar cells ppt paper presentation ppt 5 43,208 15-04-2018, 08:39 AM
Last Post: Guest
  applying summer internship in rourkela steel plant 2 13,407 11-04-2018, 04:10 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,688 23-03-2018, 09:06 AM
Last Post: ritzi
  transparent electronics seminars report 4 21,564 15-02-2018, 11:28 AM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 6 13,067 06-11-2017, 10:05 AM
Last Post: jaseela123d
  maruti suzuki summer training report 2 2,390 04-11-2017, 09:20 AM
Last Post: [email protected]

Forum Jump: