stacker reclaimer maintenance checklist
#1

Hi am Mohamed i would like to get details on stacker reclaimer maintenance checklist .I think stacker reclaimer maintenance checklist will be available here.
Reply
#2

The reclaimer cum rail-mounted stacker is suitable for serving two parallel stacks, one on each side of the track lanes. The machine is designed to operate with a blade conveyor to stack and unload at the same end during recovery, ie a reversible.

The following operating modes are possible:

1. PACKAGE - The material on the forward moving yard conveyor is lifted by the hiker and discharged through a discharge guide channel on an intermediate tilted conveyor which raises the material and finally discharges the feeder conveyor through a hopper. The pen conveyor carries the material to its end and allows it to fall from a reserve. The stacking operation begins at one end of the stack with the arm held low. The displacement movement acts simultaneously and at the other end of the stack, the motor rotates backwards. After a certain number of such cycles, the arm is thrown upward and the cycle is repeated.

2. RECOVERY - The machine recovers the layered accumulation material by rotating the hub wheel rolling through the stack. The material collected by the hub is retained and guided by the hopper of the ring while the hub is moved upwards. When the bucket is approximately 45 degrees above the horizontal, the material begins to discharge it to the hopper of the hub wheel, which guides it to the conveyor of the boom. Upon reaching the end of the pen conveyor, the material passes through the central ramp and the portal ramp onto the patio conveyor, resting on the impact table. The recovery of the entire reserve can be carried out either by type of bank and modular methods.

In the bank type method the stove starts at one end in the bank or top layer and recovers that bank for the entire length of the stack. At the end of the stack, the machine returns to the other end, the pen is lowered and recovery begins at the next lower seat.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: power point prsentation of stacker reclaimer, employee transfer checklist, software project checklist, preventive maintenance checklist for gsm bts, preventive maintenance checklist of transformer, transformer maintenance checklist in excel, transformers pm checklist,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  highway failure and maintenance pdf 0 482 27-06-2018, 08:34 PM
Last Post: Guest
  advantages and disadvantages of hot line maintenance 1 410 07-02-2018, 11:11 AM
Last Post: dhanabhagya
  Working principle of skew in bridge reclaimer 1 537 25-10-2017, 12:25 PM
Last Post: jaseela123d
  hindi ppt for tpm autonomous maintenance 1 818 15-09-2017, 09:59 AM
Last Post: jaseela123d
  apartment maintenance system project with code 1 475 11-09-2017, 09:38 AM
Last Post: jaseela123d
  apartment maintenance system pdf 2 508 08-09-2017, 10:44 AM
Last Post: jaseela123d
  stacker reclaimer maintenance checklist 1 575 17-07-2017, 11:26 AM
Last Post: jaseela123d
  maintenance of transmission lines ppt 1 450 27-06-2017, 04:29 PM
Last Post: jaseela123d
  highway failure their maintenance abstract pdf 1 826 06-06-2017, 02:42 PM
Last Post: jaseela123d
  highway failure and their maintenance pdf file downald 1 722 15-05-2017, 11:20 AM
Last Post: jaseela123d

Forum Jump: