form for summer training in hal 2014
#1

Sir I want to do summer vocational training in hal kanpur so I need a form for that can you pls provided me that kindly help me
Thanks
Muhammad husai
Reply
#2

HAL recorded the highest ever billing of Rs. 15,480 crores (provisional) for financial year 2014-15 against Rs. 15,128 crores achieved in fiscal year 2013-14. "Our performance is in line with the MoU signed with the Ministry of Defense and we expect an" Excellent "rating for the 2014-15 fiscal year.The CAPEX objective of Rs 900 crores has been achieved and we are pleased that on the front Of the indigenization more than 2000 articles were produced resulting in the melody savings of Rs. 100 crores, "said Mr. T. Suvarna Raju, CMD, HAL. The operating result for the year was Rs. 1,560 crores against Rs. 1,551 crores in 2013-14.

As part of the Design and Development activities so far 384 flights have been completed at LCH. The HAL Board of Directors has approved the production of a 4th technology demonstrator to accelerate LCH's Initial Operating Liquidation (IOC) process. Regarding the LUH, the ground test vehicle (GTV) test was recently successful. In addition, the mini-UAV designed and developed locally had its first flight during the year.

The trade negotiation proceeded with internal and bilateral meetings with Russia's participation in the FGFA program during fiscal year 2014-15. IJT surpassed the milestone of the 1000 accumulated exits with 1004 completed flights so far.

Detailed design, template fabrication and commissioning for the HAL Basic Turboprop Trainer (HTT-40) have been completed and assembly activities commenced. Indigenous LCA has so far completed 2871 flights of which 364 were carried out during 2014-15 for IAF variant. For the LCA naval variant, 43 flights have been completed and 24 flights have been made in FY 2014-15. The critical design review for the Mirage 2000 upgrade has also been completed. As for Hindustan Turbo Fan Engine-25 (HTFE-25), the detail design of the core engine is complete and the assembly tools and test evidence required are in progress. The middle thrust class engine finds wide application in military training airplanes, smaller regional aircraft and unmanned applications.

Some of the other highlights of the year included the delivery of the first ROH SU-30 MKI aircraft and the first series production of Light Combat Aircraft (LCA) developed by the Ministry of Defense, receiving the order of 14 Do-228 For IAF and Hawk aircraft production.

As part of the R & D policy, a company has been registered for the formation of the corporate Meta-university for industry-focused research related to the aeronautical sector in all disciplines and interdisciplinary areas of technologies. During 2014-15, 814 patent applications were filed, bringing the total to 1094 until March 31, 2015.

HAL took several initiatives in other areas such as the development of new products (supply of rolled rings to Siemens, Canada), customer support, quality, outsourcing and supplier development, offsets, marketing, IT, HR and CSR during 2014-15.

HAL's indigenous products captivated visitors with its static and flying exhibit during the recently completed Aero India 10th edition from February 18 to 22, 2015. The company's exhibit was entitled "Evolution of HAL as a center of excellence in Research and Aeronautical Technology for more than 75 Years of its existence ".
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: hal lucknow training form, hal summer training 2013, hal kanpur summer training 2014 kanpur summer training 2014, hal training report lko, hal summer training report ppt, when will hal summer training forms be available, hal lko training form,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,670 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,730 04-12-2018, 09:27 AM
Last Post:
  dlw varanasi summer training report for electrical electronics branch 4 15,773 23-06-2018, 12:15 PM
Last Post: Guest
Smile sbi savings account to rsp convertion form 5 3,496 15-06-2018, 07:42 AM
Last Post: Atanu Dey
  applying summer internship in rourkela steel plant 2 13,385 11-04-2018, 04:10 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,686 23-03-2018, 09:06 AM
Last Post: ritzi
  jubasree form online application 2015 1 1,227 01-01-2018, 12:27 PM
Last Post: dhanabhagya
  dlw varanasi summer training report for electrical electronics branch 6 13,043 06-11-2017, 10:05 AM
Last Post: jaseela123d
  maruti suzuki summer training report 2 2,388 04-11-2017, 09:20 AM
Last Post: [email protected]
  kibwezi teachers training college application forms 2 2,983 31-10-2017, 03:45 PM
Last Post: [email protected]

Forum Jump: