sewage treatment plant kld calculation
#1

Dear Sir

Kindly provide quotation & size for sewage treatment plant for our primary school building (ground floor only) with 80 students and 20 staff members.

Thanks & Regards

Tanya Pahwa
Reply
#2
A detailed study has been carried out on the characterization of domestic wastewater followed by the design of wastewater treatment. The present study involves the analysis of pH, total solids, total suspended solids, hardness, acidity, alkalinity chloride, chlorine, BOD, DO and heavy metals such as Iron, Copper, Zinc, Magnesium, Nickel, , Calcium, Aluminum, Silicon, Potassium. A wastewater treatment plant is much needed to receive domestic and commercial waste and eliminates materials that cause harm to the general public. Its aim is to produce a waste stream of environmentally safe fluids and solid wastes suitable for disposal or reuse. Average values ​​of pH, chloride, acidity, turbidity, residual chlorine, alkalinity, DO, Total Solids, BOD, Hardness are known. A wastewater treatment plant has been designed with treatment units as a barrier of 1.7m, aeration tank of 4.5x4.5x3,7m3, collection well of diameter 4m and depth 5m. Samples of household waste from the shelter and the university have been collected at different times of the day to have an average of the data of the measured parameters. A wastewater treatment plant has been designed with treatment units, a bar screen of 4.5x4.5x3.7m dimension
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: pfi plant design calculation, 35 mld sewage tretment plant, sewage treatment project report ppt, sewage treatment ppt powerpoint, seminar on sewage treatment, sewage treatment plant seminar pdf, sewage treatment plant in hospitals ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  applying summer internship in rourkela steel plant 2 13,379 11-04-2018, 04:10 PM
Last Post: Guest
  in vijayawada thermal power plant internship details 1 1,761 21-02-2018, 07:30 PM
Last Post: Guest
  seminor report on solar chimney power plant 2 1,547 08-01-2018, 04:59 AM
Last Post: Guest
  kati thermal power plant muzzafarpur bihar 3 1,158 16-08-2017, 01:26 PM
Last Post: jaseela123d
  overview of kothagudem thermal power plant 3 1,239 01-06-2017, 02:14 PM
Last Post: RAMEEZ sk
Tongue industrial training at durgapur steel plant 2 1,154 30-05-2017, 12:05 PM
Last Post: Afsar ali
  summer internship in rourkela steel plant 2 1,533 13-05-2017, 05:00 PM
Last Post: jaseela123d
  saddle support design calculation 2 1,430 28-04-2017, 12:58 PM
Last Post: jaseela123d
  biological synthesis of zinc oxide nanoparticles using plant extract 1 801 13-04-2017, 04:03 PM
Last Post: jaseela123d
  pneumatic vice design calculation pdf 1 1,176 13-04-2017, 11:47 AM
Last Post: jaseela123d

Forum Jump: