Kanti Thermal Power Station is located in Kanti, Muzaffarpur,90 km away from Patna, the capital of the Indian state of Bihar.[1] It is managed by the Kanti Bijlee Utpadan Nigam Ltd (KBUN),-a joint venture between NTPC and BSEB Patna.[2] The majority shares of the Joint Venture Company is hold by NTPC,with NTPC 64.57% and BSEB 35.43%.The plant has not been functional since 2003, however three successful trial runs have paved way for commercial production of Electricity by the end of 2013.[3] In November 2013,Nitish Kumar said that another new 500MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in May 2015.
History
First started in 1985, Kanti Power Plant has an installed capacity of 110×2 MW. An additional capacity of 195×2 MW is being erected and is due to be completed by December 2014.Bihar is the most power stricken state of India; and in the issue of uplifting our current nation, an excellent and clean 'Thermal Power station' is a necessity. Kanti thermal Power Plant came into existence in 1985 with the efforts of then MP of Muzaffarpur
Operations
To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named ‘Vaishali Power Generating Company Limited (VPGCL)’ with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008. Present equity holding is 64.57% by NTPC & 35.43% by BSEB. The company is renovating and modernising the existing unit.The total cost of its renovation and modernization has been over Rs. 500 Crores.The station has an installed capacity of 2 X 110 MW. Both the units are under renovation and modernization.[9] An additional capacity of 220MWx2 is being erected and is due to be completed by December 2014.In March 2013, the renovation work of two old units was completed.MTPS started commercial production from November 1, 2013 by sypplying 94 MW.This is first generation in 11 years since 2002