kati thermal power plant muzzafarpur bihar
#1

RE: training in kanti thermal power station muzaffarpur
Sir
My self Amritesh Kumar
B.Tech, 3rd year
Electrical Engineering
student
From IES COLLEGE OF TECHNOLOGY BHOPAL INDIA
Sir, I want to summer traning in your plant( THERMAL POWER PLANT KANTI, MUZAFFARPUR) project on heavy power generator, transformers and other electrical equipment.
So sir please invite me for summer traning (1st June to 15th July)

So sir please inform send me this mail-amriteshranjanrj9xm[at]gmail.com
Thanku
Reply
#2
RE: training in kanti thermal power station muzaffarpur
Sir
My self Amritesh Kumar
B.e., 3rd year
Electrical Engineering
student
From IES COLLEGE OF TECHNOLOGY BHOPAL INDIA
Sir, I want to summer traning in your plant( THERMAL POWER PLANT KANTI, MUZAFFARPUR) project on heavy power generator, transformers and other electrical equipment.
So sir please invite me for summer traning (1st June to 15th July)

So sir please inform send me this mail-amriteshranjanrj9xm[at]gmail.com
Thanku
Reply
#3
Sir i want to do 1 year traning in kati thermal power plant. How can i apply?
Reply
#4

The Kanti Thermal Station, also known as George Fernandes Thermal Station (GFTPS), is located in Kanti, Muzaffarpur, 90 km from Patna, the capital of the Indian state of Bihar. It is administered by Kanti Bijlee Utpadan Nigam Ltd. (KBUNL), a joint venture between NTPC and BSEB Patna. The majority of the shares of the Joint Venture Company are in the hands of NTPC, with NTPC 64.57% and BSEB 35.43%. The plant has not worked since 2003, however, three successful tests have paved way for commercial production of electricity by the end of 2013. In November 2013, Nitish Kumar said that another new 500MW plant will be installed in Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in March 2015. The second unit of the 2 X 195 MW was put into service on 13 June 2016. The Muzaffarpur power plant currently has An installed capacity of 610 MW. Another 500 MW extension project is also planned.

Started for the first time in 1985, Kanti Power Plant has an installed capacity of 110 × 2 MW. An additional capacity of 195 × 2 MW is being built and is expected to be completed by December 2014. Bhar is the state most affected by India's power; And in the matter of elevating our present nation, an excellent and clean "Thermal Power Station" is a necessity. The Kanti thermal power plant emerged in 1985 with the efforts of then MP Muzaffarpur, George Fernandes. Construction of the plant began during George's first tenure as PM of Muzaffarpur in 1978. In November 2014, the Kanti plant was renamed as George Fernandes Thermal Plant to recognize its contribution.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: v t treaning kati tharmal pawer,
Popular Searches: bihar kishanganj jobong com courier phone number, bihar education department, ntpc kati muzaffarpur summer traning form 2016, result of bihar electricity board, private engineering college in bihar, javas courier in muzaffarpur bihar, go javas bihar sharif,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  solution manual of cl wadhwa power system pdf free download 8 23,206 25-11-2018, 10:48 PM
Last Post:
  applying summer internship in rourkela steel plant 2 13,279 11-04-2018, 04:10 PM
Last Post: Guest
  in vijayawada thermal power plant internship details 1 1,745 21-02-2018, 07:30 PM
Last Post: Guest
  solar water purification by using thermal method pdf file 2 13,040 12-02-2018, 03:44 PM
Last Post: dhanabhagya
  seminor report on solar chimney power plant 2 1,537 08-01-2018, 04:59 AM
Last Post: Guest
  power saver for industries commercial establishments 3 2,230 06-11-2017, 09:37 AM
Last Post: jaseela123d
  tuticorin thermal power station inplant training 10 4,041 17-10-2017, 11:43 AM
Last Post: jaseela123d
  power resumption alarm circuit 2 1,377 16-10-2017, 09:48 PM
Last Post: Guest
  power generation by gravity ppt 5 1,535 13-09-2017, 12:30 PM
Last Post: jaseela123d
  mems pollution free option power generation pdf 3 1,423 27-06-2017, 12:58 PM
Last Post: jaseela123d

Forum Jump: