automatic railway gate controller using arduino
#1

plz give us the project report on automatic railway gate controller using aurdino.[/align]
Reply
#2

In fast-growing countries, accidents at unmanned level crossings and on-track obstacles are increasing day by day. So far no fruitful steps have been taken in these areas. Our project deals with automatic control of the railroad gate in a level crossing that replaces the doors operated by the porters and the detection of obstacles on the track By using the automatic control of the railroad gate at the level crossing The arrival of the train is detected by the sensors located on the side of the tracks. Therefore, the time for which it is closed is lower compared to manually operated doors. Obstacle detection on the rail tracks two things: Firstly it detects any obstacles on the track by using sensors located at the front of the train and secondly, to transmit the obstacle detection message to the nearby station Through GSM technology. The proposed system uses infrared sensors to detect the arrival and departure of the trains at the railway crossing, ultrasonic sensor to detect the obstacle on the track, GSM to transmit the obstacle message to the nearby station and Arduino to control the Opening / From the doors and to transmit the obstacle message.

The rail system is the most widely used mode of transport in India. It is also one of those modes of transport that faces many challenges due to human errors such as cross-level crashes, collisions, etc. A level crossing, an intersection of a road and a railway line, requires human coordination, the lack of What leads to accidents. Level crossings are controlled by manually operated doors. In order to avoid human errors that could occur during the operation of the floodgates, the proposed document introduces the concept of railroad automation. The level crossings are handled by the gatekeeper and the gatekeeper is instructed and the phone means in most of the level cross of the control room. But the manual error rate that could occur at these level crossings is high because they are unsafe to perform without real knowledge about the train time table. The delay in opening and closing the door could lead to railway accidents.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: home automation system using arduino, arduino for automatic control system pdf, automatic railway gate controller using fm communications, arduino automated attendance system using arduino, automatic railway gate ppt download using arduino, automatic parking using arduino pdf5, ppt on automatic railway gate controller using frequency modulation technique,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,670 06-12-2018, 10:50 AM
Last Post:
  block diagram of low cost automatic gate light with musical bell 1 7,271 06-10-2018, 05:46 AM
Last Post: Guest
  literature review of an automatic room light controller with bi directional visitor counter 4 2,268 24-10-2017, 09:53 AM
Last Post: jaseela123d
  to design an appropriate logic gate combinatin for a given truth table 1 5,536 13-10-2017, 10:26 AM
Last Post: Akash Mendhe
  four quadrant dc motor speed controller without microcontroller applications 4 3,852 05-09-2017, 03:30 PM
Last Post: jaseela123d
  automatic touch screen based vehicle driving system pdf 3 2,333 17-08-2017, 11:28 AM
Last Post: rajukuraganti
  automatic paper cutting machine by using geneva mechanism working 2 6,938 14-08-2017, 01:09 PM
Last Post: Guest
  plc based automatic dam shutter open close system project report 7 4,178 05-08-2017, 03:58 PM
Last Post: jaseela123d
  ppt of automatic speed control of vehicle at school zones using ir sensor 4 1,564 15-04-2017, 02:20 PM
Last Post: jaseela123d
  application of railway track security system 1 906 13-04-2017, 10:19 AM
Last Post: jaseela123d

Forum Jump: