Details on power factor correction unit using pic16f877a
#1

I m trying to develop a three step power factor correction unit using pic16f877a and ccs compiler but i m new in this field and do not know how to write code kindly guide me
best regardanwerzebzeb[at]gmail.com" class="mycode_email
Reply
#2

In recent years, the power quality of the AC system has become a major concern due to the rapid increase in the number of electronic equipment, power electronics and high voltage system. Most of the commercial and industrial installation in the country has large electrical charges that are alone inductive in nature causing a lagging power factor that gives heavy penalties to the consumer by the power board. This situation is taken care of by PFC. The power factor correction is the ability to absorb the reactive power produced by a load. In the case of fixed loads, this can be done manually by switching capacitors, however in case of rapidly varied and dispersed loads, it is difficult to maintain a high power factor by manually switching on / off the capacitors in proportion to the Load variation within a facility. This inconvenience is overcome by the use of an APFC panel. 

In this document the measurement of the power factor of the load is made by the use of PIC microcontrollers and activate the capacitors necessary to compensate the reactive power and bring the power factor to the unit.

Power factor is the ratio of KW and KVA. KW is the actual load power and KVA is the apparent load power. It is a measure of the effectiveness with which the current becomes a useful work output. Most industrial electrical loads have a low power factor that does not exceed 0.8 and therefore imparts distribution losses. A poor power factor may be the result of a significant phase angle, usually the result of an inductive load such as an induction motor, power transformer or induction furnace. The existing reactive power is not included in the electric bill, however, this probably causes a loss of dissipation power in the load resulting in an increase in the electric bill bill. The penalty charge is just one of the problems however there are more other problems occurs if the power factor is low. They are
A) Additional losses in power cables
B) Significant voltage drop
C) Reduction of effective cable capacity
D) Transformer secondary voltage drop
E) Transformer losses
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: iv visit in bel bangalore industrial, bel bangalore industrial visit procedure, power project details, industrial visit to bel bangalore for ece studentsy air video screen, industrial visit to bel, new project information details of microprocessor based power factor measurement control, contact bel company in banglore for industrial visit,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  solution manual of cl wadhwa power system pdf free download 8 23,198 25-11-2018, 10:48 PM
Last Post:
Smile how to take santoor soap dealership details pdf 3 2,767 26-05-2018, 12:01 AM
Last Post: Nehal Shaik
  in vijayawada thermal power plant internship details 1 1,745 21-02-2018, 07:30 PM
Last Post: Guest
  seminor report on solar chimney power plant 2 1,536 08-01-2018, 04:59 AM
Last Post: Guest
  power saver for industries commercial establishments 3 2,230 06-11-2017, 09:37 AM
Last Post: jaseela123d
  tuticorin thermal power station inplant training 10 4,039 17-10-2017, 11:43 AM
Last Post: jaseela123d
  power resumption alarm circuit 2 1,377 16-10-2017, 09:48 PM
Last Post: Guest
  power generation by gravity ppt 5 1,535 13-09-2017, 12:30 PM
Last Post: jaseela123d
  online correction of samagra id 9 6,463 28-08-2017, 11:09 AM
Last Post: jaseela123d
  kati thermal power plant muzzafarpur bihar 3 1,142 16-08-2017, 01:26 PM
Last Post: jaseela123d

Forum Jump: