need arduino code for automatic railway gate control using four IR led pairs, two on either side of gate with servo motor to open and close the gate
Posts: 14,118
Threads: 61
Joined: Oct 2014
In fast-growing countries, accidents at unmanned level crossings and obstacles on the track are increasing day by day. So far no fruitful steps have been taken in these areas. Our project deals with the automatic control of the railroad gate in a level crossing that replaces the doors operated by the porters and the detection of obstacles in the track By the automatic control of the railroad gate in the level crossing It is detected The arrival of the train By the sensors located on the side of the tracks. Therefore, the time for which it is closed is lower compared to manually operated doors. Detection of obstacles in the lane follows two things: First, it detects any obstacle in the lane using sensors located in the front of the train and, second, to transmit the obstacle detection message to the nearby station. The proposed system uses infrared sensors to detect the arrival and departure of trains at the railway crossing, ultrasonic sensor to detect the obstacle on the track, GSM to transmit the obstacle message to the nearby station and Arduino to control the opening / Gates AND to transmit the obstacle message.
The rail system is the most widely used mode of transport in India. It is one of those modes of transport that faces many challenges due to human errors like collisions, collisions, etc. A level crossing, an intersection of a road and a railway line, requires human coordination, the lack of What drives accidents. The level crossings are controlled by manually operated doors. In order to avoid human errors that may occur during the operation of the gates, the proposed document introduces the concept of rail automation. The level crossings are handled by the guardian and the goalkeeper is instructed and the phone means in most of the level crossing of the control room. But the manual error rate that could occur at these level crossings is high because they are not safe to perform without real knowledge about the train schedule table. The delay in opening and closing the door could cause railway accidents.