Least Cost System Operation: Economic Dispatch 1
#1



Introduction

Complex system time scale separation
Least cost system operation
Economic dispatch first view
Generator cost characteristics
Four curves of generator performance
Constrained optimization
Linear programming
Economic dispatch completed

Long term system planning: Production cost
Decide what to build
Hourly to monthly decisions: Unit commitment
Decide which plants to have warmed up and ready to go
Different technologies have different requirements
Minutes to Hour: Economic dispatch
Decide which plants to use to meet the expected load now
5 minutes to 1 hour
Cycles to Minutes: Short term system operations and Load Flow Model
Maintain supply and demand balance moment to moment
~17msec per cycle up to 5 minute control functions


For more details and ppt, please visit
http://science.smith.edu/~jcardell/Readi...%20ED1.ppt


Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: powersystem operation, news dispatch, ppt of seminar in operation system, alternater operation, co to znaczy dc operation fail, recursive least squares code in matlab, economic emission dispatch in generation ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
Least Cost System Operation: Economic Dispatch 1 - by seminar surveyer - 13-10-2010, 12:19 PM

Forum Jump: