A Summer Training Report On Indian Railway
#1

A Summer Training Report On Indian Railway

[attachment=16001]
Indian Railways


1853 First railway train journeyed distance of 22 miles between Bombay and Thana.

It runs 12000 trains every day

It carry 1.4 crore passengers & 16 lakh tonnes of goods every day

Daily earnings Rs120 cr

INFRASTRUCTURE


Railways have

8000 engines
40,000 coaches
about 2.5 lakh of wagons
7000 stations
1 lakh km of track

17 lakh employee worked under one organization and there is no strike since last 30 years.


RAILWAY SIGNALLING:-


Railway signalling is a system used to control railway traffic safely, essentially to prevent trains from colliding.


Mainly there are two types of signals:-

Mechanical signals:- Older forms of signal displayed their different aspects by their physical position.

Colour light signals:-On most modern railways, colour light signals have largely replaced mechanical ones








Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: indian railway airbreck, summer seminars institutes neh, railway summer training project report on compressor and expressor, clw for summer training, indian railway ec summer training report, summer training in thdc, summer training report ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
A Summer Training Report On Indian Railway - by seminar addict - 12-01-2012, 10:24 AM
RE: A Summer Training Report On Indian Railway - by Guest - 28-06-2013, 07:58 AM

Possibly Related Threads...
Thread Author Replies Views Last Post
  Indian Sugar Industry seminar addict 3 4,133 11-10-2016, 11:11 AM
Last Post: jaseela123d
  RAILWAY ENQUIRY AND RESERVATION SYSTEM seminar paper 1 1,763 25-10-2012, 12:05 PM
Last Post: seminar details
  INDUSTRIAL TRAINING project uploader 1 1,178 06-10-2012, 01:50 PM
Last Post: seminar details
  INDUSTRIAL TRAINING ON REPORTER RADAR TRANSMITTER seminar addict 1 1,589 06-10-2012, 01:50 PM
Last Post: seminar details
  INDUSTRIAL TRAINING REPORT seminar addict 1 1,599 06-10-2012, 01:50 PM
Last Post: seminar details
  FOUR WEEKS SUMMER INDUSTRIAL TRAINING seminar paper 1 1,615 06-10-2012, 01:50 PM
Last Post: seminar details
  COMPARATIVE STUDY OF CUSTOMER SATISFACTION IN INDIAN PUBLIC SECTOR seminar details 0 1,327 09-06-2012, 11:59 AM
Last Post: seminar details
  Best Practices on Financial Inclusion in Indian Banking Sector project uploader 0 1,708 09-06-2012, 11:40 AM
Last Post: project uploader
  COMPARATIVE STUDY OF CUSTOMER SATISFACTION IN INDIAN PUBLIC SECTOR full report seminar details 0 1,190 08-06-2012, 05:06 PM
Last Post: seminar details
  AUTOMATIC RAILWAY GATE CONTROL abstract seminar details 0 981 08-06-2012, 04:57 PM
Last Post: seminar details

Forum Jump: