Industrial Training at NTPC Anta Gas power Plant full report
#4


KAPIL YADAV
EC IV YEAR


[attachment=7904]

NTPC TODAY

The largest power generation company in India, with
comprehensive in-house capabilities in building and
operating power projects

Current operating capacity – 28,644 MW (including JV)

18 coal based (23209 MW) and 8 gas based (5435 MW)
power plants

Setting up hydro based power plants (2471 MW under
implementation)

Developing coal mines for captive use (47 mtpa by 2017)

Plans to become 50,000 + MW company by 2012
ONE OF THE LARGEST INDIAN COMPANIES WITH A MARKET
CAP OF MORE THAN US$ 50 BILLION

HAS A NET WORTH OF AROUND US$ 13 BILLION

THE LARGEST GENERATOR IN INDIA WITH 20% OF INSTALLED
CAPACITY & 28% GENERATION OF THE COUNTRY

494TH LARGEST COMPANY IN THE WORLD: 6TH LARGEST UTILITY
IN ASIA (FORBES RANKING – 2006)

PLATTS HAS RANKED NTPC AS NO. 1 INDEPENDENT POWER
PRODUCER COMPANY IN ASIA, 2007
GOVERNMENT HAS 89.5% STAKE

10.5% WITH PUBLIC

GROWTH STRATEGY
Multi pronged approach to capacity addition

• Greenfield projects
• Brownfield expansion
• Joint ventures /Acquisitions

• Diversification in related business areas

• Hydro projects
• Coal Mining
• Power trading
• Oil / gas exploration
• LNG value chain
• Consultancy services

NTPC .… Performance Highlights
Environmental Focus

• World’s largest ESPs used by NTPC

• Environmental monitoring emphasis

• Efforts to increase Energy efficiency

11 NTPC Stations amongst top 20 in the country in 2005-06 including
taken over plants.

Lower Plant Efficiency in India
The reported efficiency of Indian power plants is generally lower as compared
to efficiency of plants abroad, primarily due to
• Poorer condenser vacuum due to hot climatic conditions

• Higher unburnt carbon losses in boiler due to low grade high ash Indian coal

• Efficiency is reported on HHV basis of coal (same as the practice followed in USA)
as against LHV used elsewhere


Adoption of new technologies
NTPC has been a pioneer in introducing new technologies in the
country.

Currently, super critical technology, advanced class GTs are some of
the technologies under induction.

NTPC has worked on development of Integrated Coal Gasification

Our Energy Technologies Centre is working in both fundamental and
applied fields and has a well-defined mandate to develop various
technologies which will enhance plant reliability, efficiency etc.

Technologies… for cleaner environment
High Concentration Ash Slurry Disposal System

Pneumatic Conveying System for Fly Ash

Pipe Conveyors for Cross Country Coal Conveying

Vapor Absorption Refrigeration System for all

Air Conditioning Requirements of Station

Ash Water Recirculation System

ELECTROSTATIC PRECIPITATOR
NTPC has installed high efficiency Electrostatic Precipitators (ESP)
in all its coal fired units.

Typical Indian coal has 3300 kcal/kg GCV with 45 % ash content

• Four/Six pass ESPs with 10/9 fields each for 500/660 MW unit

• NTPC’s ESPs are amongst the world’s largest

• Electrode spacing of 400 mm

• ESP efficiency of the order of 99.97%

• Limits Outlet Dust Burden at outlet to 20 mg/Nm3 with design coal


Flue Gas Desulphurization (FGD)
Provision of space is being kept in all existing plants for installation of FGD in future

• NTPC is putting up Flue Gas Desulphurization (FGD) plant for its Bongaigaon
TPP (3 x 250 MW) which is proposed to use high sulphur (as high as 2%) coal.

• Adoption of wet lime stone based Gypsum recovery Process

• SO2 removal efficiency> 90%

• Utilisation of Gypsum envisaged







Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: training report of ntpc anta, seminar report on ntpc anta, ntpc anta training report, ntpc anta report pdf, pdf report for training of ntpc anta, ntpc anta vocational training report pdf, ntpc antha working pdf,
Popular Searches: industrial training report in it brach, ntpc in khalgow, pallivasal power plant, ntpc industrial visit report, training at ntpc, ppt on ntpc gas power plant, training file hydel power plant pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: Industrial Training at NTPC Anta Gas power Plant full report - by seminar surveyer - 03-01-2011, 01:15 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  New Thread in Industrial Visit Report 0 550 21-06-2023, 12:59 AM
Last Post:
  New Thread in Industrial Visit Report 0 1,211 11-04-2023, 09:00 AM
Last Post:
  Summer internship in verka milk plant, Amritsar 0 1,550 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,487 21-02-2023, 02:05 PM
Last Post:
  New Thread in Industrial Visit Report 0 2,420 25-11-2022, 03:25 PM
Last Post:
  New Thread in Industrial Visit Report 0 1,738 20-11-2022, 04:32 PM
Last Post:
  New Thread in Industrial Visit Report 0 1,272 19-10-2022, 01:42 AM
Last Post:
  New Thread in Industrial Visit Report 0 1,037 18-10-2022, 10:51 PM
Last Post:
  New Thread in Industrial Visit Report 0 743 18-10-2022, 09:29 PM
Last Post:
  New Thread in Industrial Visit Report 0 518 18-10-2022, 08:58 PM
Last Post:

Forum Jump: