ABOUT NTPC
NTPC has installed capacity of 29,394 MW.
15 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
The company has power generating facilities in all major regions of the country.
NTPC, was setup in 1975 world’s largest .
In Forbes list of World’s 2000 Largest Companies for the year 2007, NTPC occupies 411th place.
NTPC DADRI PLANT DETAILS
First Unit Commissioned 1975 (95MW)
Installed Capacity (840+817) MW
Derated Capacity 980 MW
Coal Source Jharkhand Coal Fields
Water Source Upper Ganga Canal
Unit Sizes 4x210 MW + 2x490MW
CONTROL AND
INSTRUMENTATION LAB
MANOMETRY LAB
PYROMETRY LAB
AUTOMATIC CONTROL SYSTEMS LAB
PROTECTION & INTERLOCKING LAB
FURNACE SAFEGAURD SUPERVISORY SYSTEM LAB
MANOMETRY LAB
This Lab. Consists of :
Sensor
Indicator
Scale/Recorder
[attachment=7821]
ABOUT NTPC
NTPC has installed capacity of 29,394 MW.
15 coal based power stations (23,395 MW)
7 gas based power stations (3,955 MW)
4 power stations in Joint Ventures (1,794 MW).
The company has power generating facilities in all major regions of the country.
NTPC, was setup in 1975 world’s largest .
In Forbes list of World’s 2000 Largest Companies for the year 2007, NTPC occupies 411th place.
NTPC DADRI PLANT DETAILS
First Unit Commissioned 1975 (95MW)
Installed Capacity (840+817) MW
Derated Capacity 980 MW
Coal Source Jharkhand Coal Fields
Water Source Upper Ganga Canal
Unit Sizes 4x210 MW + 2x490MW
CONTROL AND
INSTRUMENTATION LAB
MANOMETRY LAB
PYROMETRY LAB
AUTOMATIC CONTROL SYSTEMS LAB
PROTECTION & INTERLOCKING LAB
FURNACE SAFEGAURD SUPERVISORY SYSTEM LAB
MANOMETRY LAB
This Lab. Consists of :
Sensor
Indicator
Scale/Recorder