Work Process Management
#1

[attachment=4990]
Work Process Management

Project Description


The system, which was developed now, makes this process of scheduling much easier and computerized. By this system the manager or top level designated employee can fix the schedule of any employee working under him, he even can check whether the employee is free in the particular time or in other times. Thus the top level management can easily fix the process of scheduling, and even can change the appointment which is reflected immediately to the related employee avoiding direct contact of the employee resulting in saving lot of time and work overhead.

The system even has the option for only viewing the employee’s activities or appointments. This feature avoids direct contact to the respective employee’s database and activities. There is an option where only the supervisor (the top-level manager) can have direct access to the employee’s activities, he can change the appointments of the employees working under him. No other employee of the same designation or same level of hierarchy can do this.

Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: powered by mybb process performance management, work process engineering definition, work process engineering, work process design**bs post secondary**s ppt pdf, work process design, work process architecture in sap, marketing management progect work,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
Work Process Management - by project report helper - 04-10-2010, 05:05 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  A Validation Framework for the Service-Oriented Process Designing 1 954 15-02-2017, 03:58 PM
Last Post: jaseela123d
  Blood Bank Management System Using Unified Process Methodology seminar class 3 9,692 24-02-2015, 01:49 PM
Last Post: Guest
  RETAIL BUSINESS ANALYTICAL PROCESS smart paper boy 1 658 24-10-2012, 10:17 AM
Last Post: canadagoosem
  computer science project work project report maker 2 4,594 31-01-2012, 09:15 PM
Last Post: [email protected]
  The Timeboxing Process Model for Iterative Software Development smart paper boy 0 1,031 28-07-2011, 03:47 PM
Last Post: smart paper boy
  IT Project and Process Management (PPM) smart paper boy 0 942 27-07-2011, 11:09 AM
Last Post: smart paper boy
  A Frame Work for the Development of a Suitable Method to Find Shoot Length seminar class 0 964 04-05-2011, 10:14 AM
Last Post: seminar class
  Workflow Mining: Discovering Process Models from Event Logs project topics 0 823 02-05-2011, 11:22 AM
Last Post: project topics
  SMARTER WORK MANAGEMENT SYSTEM projectsofme 0 3,467 27-11-2010, 11:36 AM
Last Post: projectsofme
Wink Development of a web-based Recruitment Process System for the HR group for a company computer science crazy 1 3,605 15-08-2010, 05:15 PM
Last Post: yogitasharma

Forum Jump: