02-03-2017, 02:40 PM
Mivan is the name of the company that invented the "Aluminum Form-work". Therefore, it is often called mivan form of work as in India we call fresh drink as pepsi or coconut cola and toothpaste as colgate.
In the mivan work form we can mold the entire slab, beam, column at once making the unit a composite structure.
Bottom view of the mivan configuration;
![[Image: main-qimg-47295e90601150cec40e4ccc7b4c1dda-p]](https://qph.ec.quoracdn.net/main-qimg-47295e90601150cec40e4ccc7b4c1dda-p)
Uses of Mivan Formwork:
O 3S - Construction System - Speed, Strength, Safety
O It eliminates the construction of columns and beams
O The walls and slabs are melted in a single operation
O Specially designed, easy-to-handle lightweight aluminum pre-designed shapes
O Assembly and assembly of the part of the formwork
O Concrete wall and plate making
Advantage:
O Formwork Mivan requires a relatively
O More seismic resistance
O Greater durability
O Least joints and leakage reduction
O Highest carpet area
O Smooth finish of wall and slab
O Uniform quality of construction
Or insignificant maintenance
O Faster Termination
Limitations:
Although there are so many advantages of how Mivan-work limitations can not be ignored. However, the limitations pose no serious problem. They are the following:
O Due to the small sizes of small finishing lines seen on concrete surfaces
O Services after completion become a bit difficult due to the small width of the components
O Uniform planning is required as well as uniform elevations to be profitable
O Formwork requires number of spacer, wall loops etc that are placed @ 2 feet c / c; These cause problems such as leaks, leaks during the monsoon
O Due to box type construction, shrinkage cracks are likely to appear
O The heat of hydration is high due to the cutting walls
O It is of rigid design once placed, since any alteration becomes more difficult after
In the mivan work form we can mold the entire slab, beam, column at once making the unit a composite structure.
Bottom view of the mivan configuration;
Uses of Mivan Formwork:
O 3S - Construction System - Speed, Strength, Safety
O It eliminates the construction of columns and beams
O The walls and slabs are melted in a single operation
O Specially designed, easy-to-handle lightweight aluminum pre-designed shapes
O Assembly and assembly of the part of the formwork
O Concrete wall and plate making
Advantage:
O Formwork Mivan requires a relatively
O More seismic resistance
O Greater durability
O Least joints and leakage reduction
O Highest carpet area
O Smooth finish of wall and slab
O Uniform quality of construction
Or insignificant maintenance
O Faster Termination
Limitations:
Although there are so many advantages of how Mivan-work limitations can not be ignored. However, the limitations pose no serious problem. They are the following:
O Due to the small sizes of small finishing lines seen on concrete surfaces
O Services after completion become a bit difficult due to the small width of the components
O Uniform planning is required as well as uniform elevations to be profitable
O Formwork requires number of spacer, wall loops etc that are placed @ 2 feet c / c; These cause problems such as leaks, leaks during the monsoon
O Due to box type construction, shrinkage cracks are likely to appear
O The heat of hydration is high due to the cutting walls
O It is of rigid design once placed, since any alteration becomes more difficult after