26-07-2016, 07:02 AM
Hi am harish i would like to get details on engineering shops and foundry in vizag steel plant ppt ..My friend Justin said engineering shops and foundry in vizag steel plant ppt will be available here and now i am living at ......... and i last studied in the college/school ......... and now am doing ....i need help on ......etc
engineering shops and foundry in vizag steel plant ppt
Steel always 9 major plants in 30 million tons per annum by 2000 Indiaproduces the country's economy. The backbone of 1900 From 13 million tons of annual production, global steel and in 1950 to 842 million tons to 300 million tons has been productionraised. The major contribution of 1.9 million tons and the rest steelplants is contributed by secondarysector. VSP 6 3.51 million tons of liquid steel per annum integrated steel is one of the plantscontributing. This ISO 9001, ISO 14001 in India, with only the steelplant accredited, and OHSAS quality environmental and safety aspects of 18001certificates steel makingactivities. Major unitsand efficient maintenance and material handling systems, with operational performance improvements around the plant turn Madea and thecurrent during fiscal year 2004-05 2100 crores net profit achieved. This project is the process of creating a process equipment used for LD steel converter is associated with significant Trunnionring design verification. TheLD converter is a steel shell at 1650 ° c molten steel refractory material used for handlingthe with ship tie rods mounted on a number of withfour is suspended and four hungreducers ring through 0.1-1.0 RPM and swirling in a special broadcast with 172KW DC-4 motors. Trunnionring box with forged end magazines to 140mm plates section and withhot theentire Assembly 1000 ton vessel around 147 metal would carry tons. Mounted linear dimensions will be approximately 14 ring metersand surface mounted upright life span 1000 mm. General norms should be approx. 1 0 1 mm, but this is changing with the upcoming survey readings if distortion is more than you can afford. Inconverter No.1, survey readings 20mm distortion around to convert a planned stop displayed as the process takes approximately 40 daysshutdown andis repair tool. Keeping this in mind, a new trunnionring was imported from Russia and celebrated design changes
Hole size compared to existing mounted 0300 ftom thesystem. In necessarydimensions visiting the site and the security of a 3Dimensional modeling CATIA after using this design before implementation in relation to confirm 0180. It isnecessary to theexisting and modified design. Supportconstraintand von Mises stress certain addition model loading status has been obtained by applying to ANSYSand have been imported and mounted stress-induced themodified in the ring mounted in 25.32 n/ Mm 2 current mounted and 36.5 n/ Mm 2 isaround. ASTM-A36 mounted, with the content of the security factor to reduce 8 11 theexisting ftom and norms allowing structural safety factor 5. Will be up forthe therefore safe for thedesign operations. Data objects is presented with 3D models, images and von-misesstresses meshed. The current analysis was only stable case. The rotation of the ring mounted to consider mobility can befurtherextended.