construction challenges of bridges in hilly area seminars report
#2
construction challenges of bridges in hilly area seminar report

Foundation construction for any large bridge takes time. Problems encountered during construction of foundation depend upon type of foundation, soil strata encountered, equipment/plant deployed and logistic problems. Construction difficulties anticipated during the execution be kept in view while planning the works/ period for the job. Foundation can be opened foundation, pile foundation, well foundation or any other types of foundation.

In case of well foundation, the various type of soil are encountered and it becomes difficult to give any clear time schedule about the sinking of wells unless the soil details are very clear and the anticipated profile matched with the actual encountered. In case of bouldery and clayey soil the rate of sinking schedule is likely to be slow when compared with the sandy soil. Also there may be requirement of pneumatic sinking technique subsequent to open grabbing due to difficulties in sinking of well.

As the cost of pneumatic sinking is very high, this should be deployed judiciously. In such cases, there is need to keep the details of all the sinking difficulties in a systematic order and this can be reviewed in consultation with decision making authority.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: seminar topic on cable bridges, seminar report on a c bridges, ppt on a multi storeyed building constructed in a hilly area, seminar report in suspensiin bridges, bridges in hilly area, construction dificulties of bridges in hilly area journal, suspension bridges b tech file report pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
RE: construction challenges of bridges in hilly area seminars report - by dhanabhagya - 07-04-2016, 12:57 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  ambient security expert systems seminars ppt 2 11,424 25-08-2018, 09:19 PM
Last Post: Zik
  sample impression after seminars elln deped 4 8,769 08-02-2018, 03:55 PM
Last Post: Guest
Smile download wi vi technology seminars report pdf 2 16,433 24-01-2018, 11:27 PM
Last Post: sultan@123
  interesting seminars topics in entomology 3 8,935 28-09-2017, 11:51 AM
Last Post: jaseela123d
  solar powered aircraft seminars report pdf 2 8,214 11-10-2016, 09:36 AM
Last Post: sachinkoli
  pdf seminars report fog computing 1 8,033 09-10-2016, 06:52 PM
Last Post: hiiire
  sample impression message after a seminars for teachers 1 15,441 23-08-2016, 11:17 AM
Last Post: ijasti
  seminar report on underwater construction pdf 3 1,358 17-08-2016, 01:43 PM
Last Post: anasek
  pdf of use of discrete fiber in road construction 2 802 30-07-2016, 10:28 PM
Last Post: Guest
  sample impression message after a seminars for teachers 1 930 28-07-2016, 03:29 PM
Last Post: jaseela123d

Forum Jump: