We are pleased to introduce over selves as Mechanical contractor fully conversant with the job of fabrication and Erection of HEAVY STRUCTURS pipe line M.S. & S.S piping erection of Mechanical Equipments and installation of column trays and internals. We are well equipped with all the required Machinery tools tackles and sophisticated equipments and we have well experienced and hard working site representative, supervisors’ foreman and other fully experienced technicians for carrying out such jobs.

We have been working in construction since 1983 in Refinery's, Power, Steel, Cement, Sugar, Fertilizers and Chemical plants in different Limited companies at various sites in India. Presently we are working with M/s. Petron Engineering & Const. Limited, (MUMBAI) at Tirora (Maharastra), Kawai Salapur (Rajasthan) and at Rosa (UP). Where we have undertaking Erection of Power Boiler Structure, Pressure Parts, APH and Coal Piping etc. and with M/s. Larsen & Toubro Limited at Rajpura (Punjab) and NFL Panipat (Haryana). Where we have undertaking Erection of Power Boiler Structure & Fabrication and Erection of Structure at NFL, Panipat site. Also we are working with M/s. Kamal Engineering Corporation & M/s. Neo Structo Construction at MRPL, Manglore. Where we have undertaking Installation of Column Trays & Internals. Recently we had completed successfully Shutdown job at IOCL, Panipat & Kribhco Hazira (Surat) for Revamping of Column Trays and Internals through M/s. Kamal Engineering Corporation & Neo Structo Construction Limited.


Please Note:-

We are most experienced contractor for installation & Revamping of trays and internal of columns, Reactor and vessels etc. At present we are working with M/s. Larsen & Toubro Limited, M/s. Essar Projects, M/s. Punj Lloyd & M/s. Kevin Enterprises (P) Limited at IOCL, Paradip & IOCL, Panipat where we have undertaking installation of 52 nos. columns at IOCL, Paradip and 12 nos. columns at IOCL, Panipat. Recently we have completed installation of 32 nos. columns at BORL, Bina site and installation of 27 nos. columns at MRPL, Manglore site.
We have complete successfully installation of columns and Reactor trays and internal of 82 Nos. Columns with M/s. Larson Toubro Limited , M/s. Petron Engineering const. Ltd , M/s. Kamal Engineering Corporation , M/s. Kevin Enterprises (Mumbai) , M/s. ISGEC- at Naphtha cracker unite IOCL- Panipat during (2008-2009) we have already completed in Revamping / installation job at Jam Nagar (2 columns) at Crude 1 and crude 2nd with M/s. Sulzer India ltd. (Pune) and MRPL- Mangalore , we have completed successfully Revamp of crude (6.8 Dia) and vacuum columns (9.8 Dia) with M/s. Kamal Engineering Corporation and BPCL –Mumbai of 03 Nos. of columns in 2008-2009 and with M/s. Koch Glitch India (LTD.)
Enclosed our introductory letter along with all relevant information for your reference and record. We assure you of our best possible workmanship and competitive rates. You are requested to register our names for your approval list mechanical contractor and hope you will give us a chance to serve in your coming project work and maintenance work in esteemed organization.
Thanking you and assuring of our best services and cooperation at all times.

Yours faithfully,
For VISHAL ENGINEERING COMPANY


N.R. CHHABRA.

Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: thermal power plant construction kw cost, thermal powre plant overview, ppt on thermal plant bathinda, esp in thermal power plant ppt, interview question for thermal power plant, abstract in safety in thermal power plant pdf, working process in thermal power plant ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Messages In This Thread
THERMAL POWER PLANT - by seminar surveyer - 20-10-2010, 02:44 PM
RE: THERMAL POWER PLANT - by seminar class - 02-03-2011, 09:35 AM
RE: THERMAL POWER PLANT - by seminar paper - 23-02-2012, 05:08 PM
RE: THERMAL POWER PLANT - by seminar paper - 13-03-2012, 04:38 PM
RE: THERMAL POWER PLANT - by Guest - 19-08-2013, 11:05 PM
RE: THERMAL POWER PLANT - by Guest - 31-08-2013, 05:55 PM

Possibly Related Threads...
Thread Author Replies Views Last Post
  HYDRO POWER PLANT presentation project topics 9 22,512 01-04-2016, 12:07 PM
Last Post: seminar report asees
  biomass fuelled power plants electronics seminars 4 8,985 17-03-2015, 02:34 PM
Last Post: seminar report asees
  IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST full rep project report tiger 7 8,868 18-10-2014, 10:35 PM
Last Post: jaseela123d
  POWER ASSISTED GEAR SHIFTING MECHANISM FOR AUTOMOBILES full report project report tiger 1 9,028 25-03-2014, 11:45 PM
Last Post: Guest
  Biomass Fuelled Power Plant computer science crazy 2 9,067 15-02-2014, 03:01 AM
Last Post: Guest
  WIND FROM SUN POWER PLANT full report project report tiger 7 9,163 07-01-2013, 01:28 PM
Last Post: seminar details
Thumbs Up FLOATING POWER PLANT projectsofme 6 8,877 14-12-2012, 12:54 PM
Last Post: seminar details
  The Ball Piston Engine--A New Concept in High Efficiency Power mechanical engineering crazy 1 4,441 30-11-2012, 01:21 PM
Last Post: seminar details
  Ball piston engine - a high efficient power Computer Science Clay 9 10,681 30-11-2012, 01:20 PM
Last Post: seminar details
  PREDICTIVE MAINTENANCE USING THERMAL IMAGING project report tiger 7 6,963 28-11-2012, 01:40 PM
Last Post: seminar details

Forum Jump: