ABSTRACT
Over the past years, considerable advances have been made into the understanding of the behaviour
of using geosynthetics to improve the performance of shallow embankments. Detailed
investigations have been performed using small scale and large scale models to evaluate their
performance and to develop rational methods for design. This document provides a guide to
geotechnical engineers who wish to analyse the performances of geogrid reinforcements when
installed in different locations of the track structure.
Keywords: railways; embankments; geosynthetics; reinforcement; geogrid;
improvement; settlement; strain gauge; f.e.m.; empirical results
1. Introduction
Railways embankments on soft soil require proper ground improvement and good soil compaction.
A railway line shall be considered as a multi-layer composite system comprising of natural ground,
fill soil, reinforcement layers, rail track system and wheel train loads. The purpose of the track
components is to convert the wheel load to relatively uniform stresses on the sub-grade. The track
sub-structure layers (ballast, sub-ballast and sub-grade) have significant influence on the railways
performance: all the stresses and thus settlements occur in these layers and may be due to several
different causes including short and long term settlements due to static and dynamic loadings.
Geosynthetics have been proved to be suitable as reinforcement for both the embankment bottom
and fill at the subgrade and sub-ballast level.
The geogrid reinforcements perform the following functions:
1. create a stiff platform where horizontal shear strains and vertical settlements are controlled
and minimised;
2. increase the bearing capacity and the load distribution by enlarging the foundation slip
failure line, thus reducing vertical stresses;
3. increase the fill soil stiffness by enhancing the soil compaction, providing inner tensile
strength and an apparent long term cohesion of the fill soil even under high dynamic loads
approaching the critical speed;
4. increase the dumping efficiency of the embankment fill thus allowing higher railways speed;
5. reinforce, filter and separate the soil components.
Therefore geogrid reinforcements are frequently used for the rehabilitation of existing railway
embankments and for design of new lines as discussed below.
2 Rehabilitation of existing railway: two instrumented cases
In recent years, due to the exceptional increase of traffic, speed and train axle load, several existing
railways lines are showing signs of distress, instability and settlements. These phenomena have
serious influence on the safety and efficiency (speed restriction) of train operation. The irregularity
of the rail level under the train passage becomes rapidly worst with additional passages. The
solution of improving the top layer of the railway track by providing suitable designed sub-ballast
layer is essential to withstand higher stresses. However installing a thick sub-ballast under running
traffic is extremely difficult and expensive and sometimes impractical. The reinforcement of the
sub-ballast by means of a geogrid allows the reduction of the depth of the excavated soil and at the
same time assures higher long-term performances.
Hereby is presented the design for the rehabilitation of the Foligno-Terontola railway line, founded
on a very old embankment (second half of the XIX century) subject to continuous and differential
settlements. The design solution was determined by F.E.M. analysis and comparing empirical
results obtained by other Authors. The solution required the reinforcement of the sub-ballast by
means of a double geogrid-geotextile geocomposite layer and the excavation and replacement of the
first 0.70 m of sub-ballast with free-drainage granular fill soil to avoid swelling and desiccation
within the silty embankment, as shown in figure below.

Download full report
http://tenaxgeosynthetics/tech-doc/geogrid-reinforced-railways-embankments.pdf
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: vbspu ba1year result, result of mp bhoj, geogrid encased stone column ppt, ppt test result icap, kormosansthan, upsr result, result of belgium,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Study Of Retrofitting Of Reinforced Concrete Beams Using Advanced Composite Overlays smart paper boy 1 16,851 11-09-2014, 03:54 AM
Last Post: Guest
  POLYMER FIBER REINFORCED CONCRETE PAVEMENT smart paper boy 2 19,571 26-11-2012, 01:09 PM
Last Post: seminar details
  ALTERNATE AND LOW COST CONSTRUCTION MATERIALS AND TECHNIQUES smart paper boy 1 18,292 11-02-2012, 02:56 PM
Last Post: psatsat2
  DESIGN AND DEVELOPMENT OF SHAKE TABLE smart paper boy 4 17,546 12-01-2012, 09:42 AM
Last Post: seminar addict
  Mechanical properties of high strength concrete reinforced with metallic and non-meta smart paper boy 0 9,946 28-07-2011, 03:10 PM
Last Post: smart paper boy
  FOUNDATION DESIGN FOR THE BURJ DUBAI – THE WORLD’S TALLEST BUILDING smart paper boy 0 11,025 21-07-2011, 12:17 PM
Last Post: smart paper boy
  DESIGN AND PLAN OF A GIRLS HOSTEL smart paper boy 0 11,809 20-06-2011, 04:21 PM
Last Post: smart paper boy
  Design of Underground Water Tank seminar class 0 12,157 06-05-2011, 04:48 PM
Last Post: seminar class
  Fatigue Behavior of Reinforced Concrete Beams Strengthened with Different FRP seminar class 0 8,705 02-05-2011, 03:56 PM
Last Post: seminar class
  A DYNAMIC TEST OF A COLLISION POST OF A STATE-OF-THE-ART END FRAME DESIGN seminar class 0 7,370 02-05-2011, 03:08 PM
Last Post: seminar class

Forum Jump: