TIME MANAGEMENT OF WORKS ppt
#1

TIME MANAGEMENT OF WORKS

[attachment=17061]
Time and cost are inter-related

Increase in time Increases cost

Essence of time

Time and Tide wait for nobody


Total time & Construction time

Survey Planning and Designing

Estimation and Funding

Quantum of work

Equipment oriented

Rainy / Frost period

Land / Encumbrances

Approval by Authorities

Availability of funds


For Employer

Asset not Available

Increase in cost

Production delayed


For Executor


Escalation in cost

Loss in profit

Increased Overhead

Equipments deployed longer


Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: rubberized bitumen for road works ppt, rubberized bitumen for road works ppt**sult, works committee ppt, ppt on how tsop sensor works, time management ppt topics, diesel lokomotive works ppt, how pki works ppt,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Time Travel seminar addict 2 1,865 10-11-2014, 10:41 PM
Last Post: jaseela123d
  Radio frequency based real time Child Monitoring and alarm system simple details seminar addict 1 2,022 06-09-2014, 06:45 PM
Last Post: Guest
  REAL TIME OPERATING SYSTEM project uploader 2 2,021 01-10-2012, 03:43 PM
Last Post: seminar details
  WEARABLE REAL-TIME STEREO VISION FOR THE VISUALLY IMPAIRED project uploader 0 799 08-06-2012, 05:14 PM
Last Post: project uploader
  Real-time Transport Protocol seminar details 0 953 08-06-2012, 05:10 PM
Last Post: seminar details
  Security Watching All the Time ppt seminar details 0 886 05-06-2012, 01:10 PM
Last Post: seminar details
  REMOTE-CONTROLLED REAL-TIME CLOCK WITH DEVICE CONTROLLER seminar paper 0 1,025 15-03-2012, 04:07 PM
Last Post: seminar paper
  Real-Time Image Processing Applied To Traffic – Queue Detection Algorithm seminar paper 0 800 09-03-2012, 02:42 PM
Last Post: seminar paper
  Permanent Magnet Synchronous Machine Model for Real- Time Simulation seminar paper 0 932 02-03-2012, 02:51 PM
Last Post: seminar paper
  BAVARIAN MOTOR WORKS seminar paper 0 602 25-02-2012, 03:13 PM
Last Post: seminar paper

Forum Jump: