YAKIMA REMOTE MONITORING & CONTROL SYSTEM
#1

YAKIMA REMOTE MONITORING & CONTROL SYSTEM

[attachment=16514]
DATA ACQUISITION &
MONITORING

The YRCS alleviates many of the problems faced by
operations personnel by placing the burden of data
acquisition and problem detection on the central
computer. The YRCS collects data on the state of the
system, comparing new data received with previous
data. The remote sites are polled on a regularly
scheduled basis for current data and the data
received from each poll are checked against current
data to determine if changes have occurred. The
managers can schedule automatic polls around the
clock. Data on current gate set points, gate openings,
gate limits, a list of system status values, gate status
values, and data on remote site hardware are
provided in each poll message from each dam.


SUPERVISORY CONTROL
The cruxes of the control operations are gate set points.
Operators can schedule gate set points to occur in real time
up to 72 hours in the future. The 72-hour figure is operatorselectable.
Gate set points are defined by control operations
as the proper gate opening. Gate limits are provided as a
check on operator controls. The gate limits disallow any set
point choices made by the operator, which are out of an
adjustable range.


ALARM FUNCTIONS
Alarms can be generated at the dam sites and by the central
computer as described previously. Each alarm is assigned
a priority based on its importance to normal operation
by the river operator. The project office is not manned 24
hours a day. During non-attended hours, when alarms of a
specified threshold level are generated, the YRCS operators
are notified immediately by portable pocket beepers. The
operators can then call into the central computer using a
touch-tone telephone and receive a voice-synthesized code
of the alarm


SUMMARY
The Yakima Remote Control System is a case study
application of supervisory control and data acquisition
(SCADA) concepts for the operation and monitoring of a
large water resources project. The remote control system
allows centralized control and monitoring of a series of water
storage and diversion dams along the Yakima River which
provide irrigation water and hydropower to the Bureau of
Reclamation’s Yakima Project in south-central Washington
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: remote control system, yakima deadlock, remote monitoring control,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  PC BASED SUBSTATION MONITORING AND CONTROLLING USING RF seminar details 4 7,147 17-09-2016, 12:58 PM
Last Post: Guest
  Radio frequency based real time Child Monitoring and alarm system simple details seminar addict 1 2,020 06-09-2014, 06:45 PM
Last Post: Guest
  GSM Based Irrigation Control System seminar paper 1 2,082 24-03-2013, 08:09 PM
Last Post: Guest
  dc motor speed control seminar paper 1 1,523 21-11-2012, 01:15 PM
Last Post: seminar details
  SPEED CONTROL OF DC MOTOR USING full report seminar details 1 2,007 21-11-2012, 01:14 PM
Last Post: seminar details
  POWER SYSTEM STABILITY: NEW OPPORTUNITIES FOR CONTROL seminar addict 1 1,689 06-11-2012, 01:26 PM
Last Post: seminar details
  cell phone based remote control system seminar addict 2 1,958 20-10-2012, 12:59 PM
Last Post: seminar details
  ERROR CONTROL CODING ppt seminar details 0 1,649 12-06-2012, 01:03 PM
Last Post: seminar details
  IMPLEMENTATION OF DSP BASED SENSORLESS CONTROL WITH DIRECT BACK-EMF DETECTION ....... project uploader 0 1,152 09-06-2012, 04:56 PM
Last Post: project uploader
  Robust Nonlinear Excitation Control Based on A Novel Adaptive Back seminar details 0 923 09-06-2012, 01:18 PM
Last Post: seminar details

Forum Jump: