WASA’s Approach to Financial Risk Mitigation in CSO Program Implementation
#1

WASA’s Approach to Financial Risk Mitigation in CSO Program Implementation
Agenda

What is WASA?
CSO Program
Financial Risk Mitigation Examples:
Synergy with Other Programs
Alternate Project Delivery
What is WASA?
Independent Authority formed in 1996
Formerly Water and Sewer Utility Administration (WASUA) under Dept. of Public Utilities
Services Provided
Water Distribution
Wastewater Collection and Treatment
Storm water Collection and Conveyance
Serves
District
Parts of Maryland & Virginia
Blue Plains Wastewater Treatment Plant
Largest advanced wastewater treatment plant in the world
Capacity:
370 mgd annual average
1076 mgd wet weather
740 mgd full treatment
336 mgd excess flow treatment
Current average annual flow is 330 mgd
Synergy with Other Programs: Nitrogen Removal Requirements
LTCP was developed prior to nitrogen removal requirement at Blue Plains
TN removal was a goal equivalent to about 7.5 mg/L
No effluent limit
April 2007
New TN permit limit added to NPDES Permit
Hard annual cap effluent limit equivalent to about 4.16 mg/L TN
WASA considered many alternatives
By modifying the approach to treating wet weather flows, WASA could economically combine TN removal and wet weather treatment
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: rmsa financial management program manual annexure iv, the effect of portfolio diversification on risk and returns of financial assets, epa risk management program, cso main data dissemination service database direct, risk management and financial institutions**, plains, implementation of c program for dfa,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  DISASTER MANAGEMENT AND MITIGATION: AN ENGINEER’S PERSPECTIVE seminar addict 5 4,993 07-08-2014, 07:26 PM
Last Post: seminar report asees
  RSA ALGORITHM IMPLEMENTATION project uploader 2 2,401 26-06-2013, 06:39 PM
Last Post: arora_rachna04
  The NIAC Space Elevator Program seminar addict 2 1,626 20-11-2012, 12:55 PM
Last Post: seminar details
  DESIGN AND IMPLEMENTATION OF LASER BASED HOME SECURITY SYSTEM seminar addict 1 2,378 22-10-2012, 02:29 PM
Last Post: seminar details
  VLSI Design and Implementation of Low Power MAC Unit with Block Enabling Technique project uploader 1 1,662 02-10-2012, 01:09 PM
Last Post: seminar details
  Benefits of the 3R approach for agricultural waste management seminar details 0 1,008 12-06-2012, 01:01 PM
Last Post: seminar details
  Implementation of an IEEE 802.11 Wireless LAN Model using OPNET seminar details 0 1,247 11-06-2012, 05:58 PM
Last Post: seminar details
  Micro Turbine Generator Program project uploader 0 1,062 11-06-2012, 02:02 PM
Last Post: project uploader
  The CoQUOS Approach to Continuous Queries in Unstructured Overlays seminar details 0 1,048 09-06-2012, 05:21 PM
Last Post: seminar details
  IMPLEMENTATION OF DSP BASED SENSORLESS CONTROL WITH DIRECT BACK-EMF DETECTION ....... project uploader 0 1,152 09-06-2012, 04:56 PM
Last Post: project uploader

Forum Jump: