FORMWORK



When concrete is placed, it is in plastic state. It requires to be supported by temporary supports and castings of desired shape till it becomes sufficiently strong to support its own weight. This temporary casing is known as the formwork or forms or shuttering. The term moulds is sometimes used to indicate formwork of relatively small units such as lintels, cornices etc.



Definition of formwork:-

"Forms or moulds or shutters are the receptacles in which concrete is placed, so that it will have desired shape or outline when hardened. Once concrete develops the adequate strength to support its own weight they can be taken out". .. (ACC).

"Formwork is the term given to either temporary or permanent moulds into which concrete or similar materials are poured". … (Wikipedia Encyclopedia).



Requirements of a good formwork

The essential requirements of formwork or shuttering are: -

a) It should be strong enough to take the dead and live loads during construction.

b) The joints in the formwork should be rigid so that the bulging, twisting, or sagging due to dead and live load is as small as possible. Excessive deformation may disfigure the surface of concrete.

c) The construction lines in the formwork should be true and the surface plane so that the cost finishing the surface of concrete on removing the shuttering is the least.

d) The formwork should be easily removable without damage to itself so that it could be used repeatedly.

Classification of Formwork

Formwork can be classified according to a variety of categories, relating to the differences in sizes, the location of use, construction materials, nature of operation, or simply by the brand name of the products. However, the huge amount of tropical wood being consumed each year for formwork has resulted in criticism from environmentalists, as well as the continual escalation of timber prices. As a result, there has been a strong tendency to use other formwork materials or systems to replace timber. The different categories in which formwork can be classified are:

a) According to size.
b) According to location of use.
c) According to materials of construction.
d) According to nature of operation.
e) According to brand name of the product.
Classification according to size
Classification according to the size of formwork can be very straightforward. In practice, there are only two sizes for formwork; small-sized and large-sized. Any size which is designed for operation by workers manually is small-sized. Very often, the erection process is preferably handled by a single worker, with site work best done independently to avoid possible waiting times. Due to reasons of size and weight, the materials and construction of small-sized formwork are thus limited. At present, the most common systems are made of timber and aluminium, and are usually in the form of small panels. There is seldom medium-sized formwork. In cases in which large-sized formwork is used, the size of the form can be designed as large as practicable to reduce the amount of jointing and to minimize the amount of lift. The stiffness required by large-sized formwork can be dealt with by the introduction of more stiffening components such as studs and soldiers. The increase in the weight of the formwork panels is insignificant as a crane will be used in most cases.

Classification according to the location of use: -
There are not many effective formwork systems for stairs and staircases. The complicated three-dimensional nature of an element involving suspended panels and riser boards, as well as the need to cope with very different spatial and dimensional variances as required by individual design situations, cannot be achieved by a universally adaptable formwork system
Classification according to materials of construction

Materials used for formwork are traditionally quite limited due to finding the difficult balance between cost and performance. Timber in general is still the most popular formwork material for its relative low initial cost and adaptability Steel, in the form of either hot-rolled or cold-formed sections and in combination with other sheeting materials, is another popular choice for formwork materials. In the past two to three years, full aluminium formwork systems have been used in some cases but the performance is still being questioned by many users, especially in concern to cost and labor control.

Formwork can be operated manually or by other power-lifted methods. Some systems are equipped with a certain degree of mobility to ease the erection and striking processes, or to allow horizontal moment using rollers, rails or tracks.

Timber and aluminium forms are the only manually-operable types of formwork. They are designed and constructed in ways that they can be completely handled independently without the aid of any lifting appliances. On the other end of the scale, such systems are used in very large-sized and horizontally-spread buildings with complicated layout designs which require the systems' flexibility. Fig 2.4 & 2.5 shows the formwork system allowing the incorporation of pre-cast elements and self climbing form with hydraulic jack devices respectively.

Reply
#3

Mivan shuttering cleaning chemical solution to removing rust and concrete build-up on aluminium formwork. It also known as Katharos-AL-301. Katharos-AL-301 is innovative chemical solutions for cleaning aluminium shuttering plates.
Mivan shuttering cleaning chemical quickly removes hardened concrete. It save the time and cost in grinding and cleaning. By using this chemical, we can prevent damage of aluminium plates due to grinding.
The oxidation and corrosion of aluminium plate will not occur by using this product.It reacts with only free lime of cement on aluminium plates.

jaibanorganics.com/mivan-shuttering-cleaning-chemical/
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: a mivan shuttering project pdf, journals on mivan shuttering works pd f, disadvantages in mivan technology in construction, www mivan shuttering checking list, disadvantage of mivan shuttering, mivan material list, aluminum shuttering for rcc constuction of building in india,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  download ppt on mivan technology only 1 985 26-04-2016, 12:01 PM
Last Post: dhanabhagya
Wink pdf of fabrication automatic drain cleaner machine 2 933 09-04-2016, 05:16 PM
Last Post: pandiyarajan248 @gmail.com
Smile download solar based vacuum cleaner project report 1 895 09-04-2016, 12:39 PM
Last Post: dhanabhagya
  automatic whiteboard cleaner ppt 1 485 04-04-2016, 12:11 PM
Last Post: dhanabhagya
  abstract fabrication of spark plug cleaner tester 1 572 28-03-2016, 02:39 PM
Last Post: dhanabhagya
  drain cleaner machine abstract 1 659 26-03-2016, 03:01 PM
Last Post: dhanabhagya
Thumbs Down automatic drain cleaner project pdf free download 1 1,162 22-03-2016, 02:45 PM
Last Post: dhanabhagya
  automatic whiteboard cleaner ppt 1 691 22-03-2016, 02:18 PM
Last Post: dhanabhagya
  drain cleaner machine abstract 1 687 04-03-2016, 02:27 PM
Last Post: seminar report asees
  solar operated automatic board cleaner 1 579 02-03-2016, 02:03 PM
Last Post: seminar report asees

Forum Jump: