Direct Sequence Spread Spectrum (DSSS) Modem Reference Design
#1

Much of the signal processing performed in modern wireless
communications systems—such as digital modulator/demodulator
applications—takes place in the digital domain and requires high
throughput. Dedicated hardware can provide the processing capability to
meet this requirement. The parallel processing capability of Altera®
programmable logic devices (PLDs) makes them ideal for
baseband/intermediate frequency (IF) digital signal processing
applications.
The direct sequence spread spectrum (DSSS) digital modem reference
design is a hardware design that has been optimized for the Altera APEX™
DSP development board (starter version), which features an APEX
EP20K200E device. The reference design is a spread spectrum
modulator/demodulator subsystem that can be used as a starting point
for a complete 3G or fixed wireless modem. The design highlights the ease
of use, performance, and efficiency of implementing a design using Altera
devices and DSP intellectual property (IP) cores.
The design uses the correlator, FIR compiler, and NCO compiler
MegaCore® functions, and uses 7,183 logic cells and achieves 100-MHz
performance. A parameterizable UART and a Windows application
enables communication between the APEX DSP development board and
a PC via the board’s RS-232 interface, yielding a true development
platform for intermediate frequency (IF) modem designs. The reference
design includes VHDL source code (except for the IP cores), and a
simulation library and test bench for simulation in ModelSim simulators.
Allocating channel resources using spread spectrum techniques are a
favorable alternative to allocating channels using frequency division
multiple access (FDMA) or time division multiple access (TDMA)
schemes. By spreading the spectrum of the data to be transmitted with
orthogonal codes, the receiver can decode each user’s data uniquely, even
though many users share the same spectral and temporal channel
resources.
Direct Sequence Spread
Spectrum (DSSS) Modem
Reference Design
A-FS-14-1.0
2 Altera Corporation
FS 14: Direct Sequence Spread Spectrum (DSSS) Modem Reference Design
The two primary methods used to spread the baseband data spectrum are:
■ Frequency hopping spread spectrum (FHSS)—The frequency of the
modulating carrier varies in a pseudo-random manner unique to
each user.
■ Direct sequence spread spectrum (DSSS)—The data is spread by
multiplication with a channelization code prior to up-conversion to
an intermediate frequency.
Each method has its advantages and disadvantages. For example, in a
DSSS systems, the designer can reduce narrowband interference in the
same channel by increasing the processing gain, but this technique cannot
be used in FHSS schemes. However, FHSS schemes are less susceptible to
jamming and the receiver is easier to implement, usually requiring only a
simple analog limiter/discriminator.
This functional specification discusses the DSSS digital modem reference
design. The design modulates direct sequence spread data onto an IF
carrier. The modulated data is then input to a channel model and is passed
to a digital receiver, which demodulates and recovers the data from the
received IF signal

download full report
http://alteraliterature/fs/fs14_dsss.pdf
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: spread spectrum communication, spread spectrum multiple access pdf, spread spectrum direct sequence, generation of spread spectrum pn sequence, contoh spread anggaran, design of wireless modem circuit diagram, direct sequence code division pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Exploring the design space of social network-based Sybil defenses 1 937 15-02-2017, 02:55 PM
Last Post: jaseela123d
  Design of Intranet Mail System nit_cal 14 11,520 19-05-2015, 11:17 AM
Last Post: seminar report asees
  Design and Implementation of TARF: A Trust-Aware Routing Framework for WSNs Projects9 6 3,595 10-01-2015, 11:13 PM
Last Post: Guest
  Persuasive Cued Click-Points: Design, Implementation, and Evaluation of a Knowledge-B Projects9 3 3,053 15-04-2013, 11:14 AM
Last Post: computer topic
  Cooperative Caching in Wireless P2P Networks: Design, Implementation, and Evaluation seminar class 2 3,342 02-02-2013, 02:08 PM
Last Post: seminar details
  Design of Shopping Mall Management System seminar class 1 4,252 12-01-2013, 10:26 AM
Last Post: seminar details
  Brain Computer Interface Design Using Band Powers Extracted During Mental Tasks seminar class 1 2,044 01-01-2013, 10:48 AM
Last Post: seminar details
  Internet Security and Firewall Design smart paper boy 1 1,878 10-12-2012, 01:23 PM
Last Post: seminar details
  DESIGN OF AN INTRANET MAIL CLIENT SYSTEM Electrical Fan 1 3,095 06-12-2012, 01:35 PM
Last Post: seminar details
  Design of DMA Controller (ip Core) Using Vhdl (Power Aware Soc Design) smart paper boy 1 1,582 30-11-2012, 12:47 PM
Last Post: seminar details

Forum Jump: