tuticorin thermal power station inplant training
#1
Smile 

sir,
I am Antony Kishore from tuticorin.I was doing my 2nd year B.TECH(EEE) at karunya university,coimbatore... Sir, I was very much intrested to visit our tuticorin thermal power plant as my implant training..Sir, From dec 19- jan 3 i had christmas vacation.. so on that time can i come to thermal power plant for atleast one day training..
I expect a good reply from you as soon as possible///
Reply
#2

To get full information or details of tuticorin thermal power station inplant training please have a look on the pages

http://scribddoc/77232738/Report-on-Inplant-Training#scribd

if you again feel trouble on tuticorin thermal power station inplant training please reply in that page and ask specific fields in tuticorin thermal power station inplant training
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: inplant training procedure for tuticorin thermal power station, final year engineering project in tuticorin thermal plant, thermal power station tuticorin implant training, tuticorin thermal power station inplant training report, inplant training report for thermal power station samples, ennore power themal inplant training procedure**, how to apply for apprentice training in mettur thermal power station,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,672 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,732 04-12-2018, 09:27 AM
Last Post:
  solution manual of cl wadhwa power system pdf free download 8 23,489 25-11-2018, 10:48 PM
Last Post:
  dlw varanasi summer training report for electrical electronics branch 4 15,796 23-06-2018, 12:15 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,687 23-03-2018, 09:06 AM
Last Post: ritzi
  in vijayawada thermal power plant internship details 1 1,766 21-02-2018, 07:30 PM
Last Post: Guest
  solar water purification by using thermal method pdf file 2 13,180 12-02-2018, 03:44 PM
Last Post: dhanabhagya
  seminor report on solar chimney power plant 2 1,547 08-01-2018, 04:59 AM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 6 13,056 06-11-2017, 10:05 AM
Last Post: jaseela123d
  power saver for industries commercial establishments 3 2,238 06-11-2017, 09:37 AM
Last Post: jaseela123d

Forum Jump: