we students M.THILAK, G,BALAJI, H.KIRANKUMAR, V.VISHAL are part of third year students from JAYA ENGINEERING COLLEGE, CHENNAI- 602024. under ELECTRONICS AND INSTRUMENTATION ENGINEERING(E&I).. WOULD like to undergo in-plant training in your highly named tuticorin thermal power plant during semester holidays.
Reply
#2
tuticorin thermal power plant inplant training registration form

[Image: 3.jpg]

About Thermal Power

A thermal power station is a power plant in which the prime mover is steam driven. Water is heated, turns into steam and spins a steam turbine which drives an electrical generator.Almost all coal, nuclear, geothermal, solar thermal electric, and waste incineration plants, as well as many natural gas power plants are thermal.Such power stations are most usually constructed on a very large scale and designed for continuous operation.

[Image: encrypted-tbn1.gstaticimages?q=tbn:ANd9G...zILaHrVyHQ]

TUTICORIN THERMAL POWER STATION.

• TTPS is situated near the new port of Tuticorin on the sea shore
of Bay of Bengal and spread over an area of 160 Hectares.
• TTPS has a total installed capacity of 1050 M.W comprising 5
units of 210 M.W each.
• The station was erected in III Stages.
• The first stage consists of units I & II of 210 M.W each at a total
cost of Rs.178 crores.
• The second stage consists of 210 Unit III at a cost of Rs. 89
crores.
• The third stage consists of Units IV& V of 210 M.W each at a total cost of Rs.804 crores.
• The units are all coal based.
• Coal is transported by sea through ships form Haldia, Paradeep, Vizag ports to TTPS.
• Generation and Plant load factor(PLF) for the year 2010-11 is 7113.696 MU and 77.33 % respectively.
Record of continuous running


Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: final year project in tuticorin thermal power plant, inplant training report in thermal power plant related to mba, t turbine plant tuticorin, offline inplant form of badh ntpc, tuticorin thermal power plant inplant training, thoothukudi thermal power plant inplant training, ennore thermal power plant inplant training,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  power plant instrumentation by krishnaswamy pdf free download 3 24,006 10-02-2019, 07:00 PM
Last Post:
  jobs in kanti thermal power plant muzaffarpur 3 8,789 17-01-2018, 01:14 PM
Last Post: [email protected]
  download tsc registration certificate 6 1,753 27-06-2017, 03:21 PM
Last Post: jaseela123d
  when are the application for lilitha nursing training 2016 1 7,516 07-04-2017, 12:40 PM
Last Post: jaseela123d
  when are the application for lilitha nursing training 2016 1 904 27-03-2017, 10:49 AM
Last Post: jaseela123d
  shanzu teachers training college fee structure 3 1,242 28-02-2017, 09:29 AM
Last Post: jaseela123d
  lilitha nursing training college 2017 intake 6 1,704 24-02-2017, 12:11 PM
Last Post: jaseela123d
  seminar topics in plant science and biotechnology 3 1,591 14-02-2017, 11:03 AM
Last Post: ijasti
  dlw summer training application form 2016 17 5 2,048 10-02-2017, 04:41 PM
Last Post: Arun Kumar yadav
  lilitha nursing training college 2017 intake 4 1,629 27-11-2016, 10:54 PM
Last Post: phelokazi khwele

Forum Jump: