Turbo Generators BHEL
#1

[attachment=9501]
Industrial Training Project on Turbo Generators
Overview of B.H.E.L.

 Bharat Heavy Electricals Limited (B.H.E.L.) is the largest engineering and manufacturing enterprise in India.
 BHEL caters to core sectors of the Indian Economy viz., Power Generation's & Transmission, Industry, Transportation, Telecommunication, Renewable Energy, Defense and many more.
B.H.E.L., Hardwar
 Bharat Heavy Electricals Limited (B.H.E.L.), Hardwar has two manufacturing plants:-
 Heavy Electrical Equipment Plant(HEEP)
 Central Foundry Forge Plant(CFFP)
H.E.E.P.
 Heavy Electrical Equipment Plant (HEEP) located in Hardwar is one of the major manufacturing plants of BHEL. The core business of HEEP includes design and manufacturing of large steam and gas turbines, turbo generators, hydro turbines and generators, large AC/DC motors and so on.
The various blocks in HEEP are as follows:
 Block-1: Turbo generator Shop
 Block-2: Fabrication Shop
 Block-3: Turbine Shop
 Block-4: Insulation Block
 Block-5: Forging Shop
 Block-6: Stamping Shop
 Block-7: Packing and Wood Working Shop
 Block-8: Condenser and Piping Shop
 New Blade Shop
PROJECT
TURBO GENERATORS
BLOCK -1

 Machine section
 Assembly section Hydro generator
 Stator winding
 Machine section
 Iron assembly
 Heavy rotor assembly section
 Stator winding section Turbo generator
 Armature/Rotor section
 General assembly section
 Test stands
TECHNICAL DATA
RECTIFIER WHEEL

 Constructional Features Of Turbo Generator
 The two pole uses hydrogen cooling for rotor winding and direct water cooling stator winding.
Turbo generator consists of following parts:
o STATOR
o ROTOR
o BEARINGS
o SHAFT BEARINGS
Other additional auxiliaries:
o Excitation system
o Gas system
STATOR
Stator consists of following parts:
o Stator frame
o Stator core
o Stator winding
o Locating bars
o End shields
o Terminal bushings
o Phase connectors
o Hydrogen cooler
o End winding vibration
o Supervision of generator
STATOR FRAME
ROTOR

Rotor consists of following parts:
o Rotor shaft
o Rotor winding
o Retaining ring
o Field connection
o Fans
o Rotor cooling system
o Bearings
o Shaft seals
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: ppt on turbo alternator of bhel hyderabad, bhel haridwa r cs project**antages, bhel turbo generators, abstract of manufacturing of turbo generators, 500 mw turbo generators, competitors on bhel edn, bhel deploma trening,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  bhel trichy industrial visit 0 554 06-07-2018, 12:08 PM
Last Post: Guest
  bhel trichy industrial visit 0 517 04-07-2018, 02:58 PM
Last Post: Guest
  report on bhel haridwar block 4 0 421 30-06-2018, 11:42 PM
Last Post: Guest
  bhel jhansi summer training ppt 0 428 21-06-2018, 02:05 AM
Last Post: Guest
  pest of bhel pdf 0 322 07-04-2018, 11:01 AM
Last Post: Guest
  apply for minor training in bhel bhopal 0 424 27-03-2018, 07:12 PM
Last Post: Guest
  bhel training civil engineering 0 385 19-02-2018, 11:20 AM
Last Post: Guest
Wink fabrication of turbo super charger for two wheeler pdf 1 391 09-12-2017, 08:57 AM
Last Post: jaseela123d
  bhel haridwar winter training 1 509 24-11-2017, 02:29 PM
Last Post: jaseela123d
  list of topics for internship in bhel for ece students 0 386 17-10-2017, 11:13 AM
Last Post: Guest

Forum Jump: