training report ees in pdf dlw varanasi
#1

hi my self rohit i would like to get details on training report ees in pdf dlw varanasi.
Reply
#2

1. o TYPE Departmental undertaking of the ministry of Railways ,Government of Indiao INDUSTRY Railway & Locomotiveo FOUNDED 16 April 1853o HEADQUARTERS New Delhi , Delhi , Indiao KEY PEOPLE Mamata banerjee (ministry of railway) vivek sahai( chairman, railway board)o SERVICE Rail transporto REVENUE Rs 88,355 crore(US$ 202.56 million)(2009-10)o NET INCOME Rs. 951 crore(US$ 202.56 million) (2009-10)o EMPLOYEES 1,600,000(2009)o PARENT Ministry of Railway, Government of Indiao DIVISION 16 Railway Zones(excluding konkan Railway)o WEBSITE indianrailway.gov.in
2. History of DLW DLW is production unit under ministry of railway. This is set in collaboration with AMERICAN LOCOMOTIVE COMPANY (ALCO) U.S.A in 1961, in ancient temple city Varanasi. First locomotive in rolled out in 1964. D.L.W is only manufacture of Diesel Electric locomotive with both ALCO and General Motors Technologies in the world. DLW got its first ISO certification in 1997.Recently DLW has obtained “Integrated Quality and Environment Management System” certification based on ISO-9001 and ISO-14001 in dec,02. DLW exports Locos to SRILANKA ,MALAYSIA, BANGLADESH, TANZANIA, VIETNAM.
3. • Basic Information- Address- Diesel locomotive works Varanasi- 221004 (India) Railway Station- Varanasi Airport- Babatpur, Varanasi Telecommunication- Telephone +91-0542-270551 t0 270555 Fax +91-0542-270603 Website diesellocomotive.com• Silent feature- Annual production- 125 Locomotive Total no. Of Staff- 7223 Workshop Land- 89 hectares Covered Area Shop- 86300 Sq.m. Electrical Power Requirement- 3468KVA (Average Maximum Demand) Electrical Energy Consumption- 19.8 Million
4. Diesel fuel The word "diesel" is derived from the German inventor Rudolf Christian Karl Diesel who in 1892 invented the diesel engine. Diesel, or diesel fuel, is any fuel that is used to operate a diesel engine. Most commonly, it refers to a specific liquid fuel obtained by the fractional distillation of petroleum, often called petro diesel. Alternative diesel fuels not derived from petroleum are biodiesel and biomass to liquid (BTL) or gas to liquid (GTL) diesel. Diesel and petrol both are petroleum product. Yet diesel is more used.
5. LocomotiveA locomotive is a railway vehicle that provides the motivepower for a train.The word originates from the latin loco – "from a place" +Medieval Latin motivus, "causing motion", and is a shortenedform of the term locomotive engine.The first successful locomotives were built by Cornishinventor Richard Trevithick.Locomotive in India consist of electric anddiesel locomotives .Steam locomotives are nolonger used, except in heritage area.Locomotives are also called locos or engines.
6. Training is being followed in following areas SHOP FLOORHWS HMS LMS ROTOR CRP HTS SAS EES ET LFS SMS TM TMS PS LAS LTS TR PMS INSP MRS OUTSIDE SHOP FLOOR MCO SPC DES MKTG AC Plant PCO TOT MOD TTCELECT Lab (TTC) WELD Lab T.Ex. Colony TOT MOD PLG EDP
7. MRS LTS My four week training was confined to three different sections EMS
8. Main Receiving Substation(MRS)• MRS receives main supply from UPPCL at 33kv. Earlier it was UPSEB.• This is step down with 7.5MVA transformer. The 33kv feeder is transformed is two 11kv feeder with a bus coupler in between.• The MRS follows the ring type distribution system for supplying power to DLW. The advantage of ring type system is that each substation is fed from two sides. If in case one line is faulted then the substation is fed by other line. But major disadvantage of ring type system is that it is too costly.
9.  Main component of MRS Transformer Control Panel Bus Coupler Relays Circuit Breakers Capacitor Bank Switch board Attendant Different type of transformer used in MRS Potential transformer Current transformer Distribution transformer
10. Single line diagram
11. 33 kv of feeder from UPPCL11KV feedersupply from P.T.UPPCL L.A. G.O. SWITCH C.T. OCB B.C.MRS SUB-STATION
12. CIRCUIT BREAKERIt is an automatic- operated electricalswitch Designed to protect an electricalcircuit from damage Caused byoverload or short- circuit.Circuit breaker, electrical device that cut offthe electric current through electric circuitunder abnormal condition. They are classified as:-  Low voltage CB Medium voltage CB High voltage CB Oil circuit breaker
13. There are 3 DG sets in DLW IT CONSIST OF:- Cylinder Alternator VCB Prime mover Compressor Transformer Cooling tank Breather Panel Natural grounding relay Load Cylinder Horse power 1780 16 2600 HP 850 12 1200 HP 2250 16 3500 HP
14. COOLING SYSTEM • There is a RADIATOR COOLING system:- in this system Mobile ( gets cooled by) Chromate water (gets cooled by) Raw water
15. Control PanelControl panel is a flat , oftenvertical area where control ormonitoring instruments aredisplayed.PROTECTIONMETERING & INDICATIONBREAKER
16. RELAYS : Relays are used for protection of the power system fromdifferent faults which are occurring in the power system. Arelay is a simple electrochemical switch made up of anelectromagnets and a set of contacts. Relays are foundhidden in all sorts of devices. TWO TYPE OF RELAY USED IN MRS :- (QUANTITY AND AMPLITUDE)  Definite relay  Inverse relay
17. CAPACITOR BANK:- In the electrical system the power factor play a important role because byimproving the power factor one can reduce losses . Generally power factorshould not be brought below 0.8 for industrial loads. To improve powerfactor, capacitor bank are placed in parallel with the power supply. InDLW, 600KVAR capacitor bank is used for the improvement of power factor. Reason for Improvement of Power Factor:Reduced lossesReactive power decreased active power increasesEfficiency of machine increasesAdvantages of Using Capacitor Bank:Easy to increase the capacityReliability of the system is highControlling of bank is easyMaintenance is easy
18. ELECTRICAL MAINTENANCE SHOPDLW is divided into two divisions (asper production)•Engine division•Locomotive divisionAs per EMS is divided into followingarea:-•B & C (Engine div)•D ,G, F (Loco div)•Electronic lab•Overhead crane shop
19. Area-B1-Heavy machine shop (HMS)2-Heavy weld shop (HWS)3-Rotor shop (RS)4-Service shop (PMS, CTS, ERS)5-TTCTYPES OF MACHINE:• Conventional• Numerical Control (NC)• Computerized Numerical Control (CNC)
20. CONVENTIONAL N.C. C.N.COccupies more space Depend on design Occupies less spaceCycle time is more Cycle time is less Cycle time is lessRun by operator and Run by paper tape and Run by paper tape orcomplex is not possible complex machine is memory and complex partially possible machine is possibleProne to human error, Flexibility to some extent High degree of flexibilitydesign modification is design, modification anddifficult editingRepeatability depends on Depends only a little on Very high repeatability,operator operator independent of operatorNo facility of storing Though not available in all Program storage, editingdiagnostic of designed machines, some NCS have and fault diagnostics isalgorithm back up memory for limited possible inputLimitation in selecting specific Selection of optimum speed Selection of specific parameterscutting parameters and feed is possible to some is possible extent
21. C.N.C. MACHINEControl system further energized with a mini-computer or post-processor.C.N.C machines have the ability to edit or alter the existingprogram in no time .
22. AREA C :1-LMS (Light Machine shop)2-SAS (Sub-Assembly shop)3-ES (Engine Erection Shop)4-engine testing shop (ET)5-Main gauge roomTYPE OF MAINTENANCE:• Breakdown maintenance• Preventive maintenance.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Tagged Pages: ees shop in dlw varansi report pdf,
Popular Searches: ees shope in dlw varanasi, varanasi dlw training report, training report on dlw varanasi, mco 1510 85, pipe shop in dlw in pdf, project report dlw varanasi pdf, uppcl,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 649 18-11-2020, 03:08 PM
Last Post:
  Report in PDF format 0 7,385 18-05-2020, 11:28 AM
Last Post:
  Summer training pdf 0 1,305 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,869 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,901 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 2,001 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,643 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,843 23-10-2018, 02:37 PM
Last Post: Guest
  diamond ultimate semiconductor seminar report pdf 0 6,291 18-10-2018, 11:41 AM
Last Post: Guest
  beam engine mini project report file download pdf 0 10,966 14-10-2018, 09:03 PM
Last Post: Guest

Forum Jump: