TRAINING REPORT AT GUJARAT SIDHEE CEMENT LIMITED (GSCL)
#1

[attachment=14381]
PRODUCTION DEPARTMENT
I was in production department, I Shaw and understood various processes to make clinker and cement. Main reaction process occurs in kiln at 1400C to make clinker. To make cement grinding and rubbing processes take in cement mill. Main process is as below:
MINING:
They have two types of mining process: Conventional mining (Blast mining) and Eco-friendly surface mining. In blast mining, Drill a hole with the help of drilling machine and fill the explosive material into that hole, allow exposing and it will take limestone from earth. Second one is the surface mining. In the mining surface miner is used to extract the limestone from earth. Blast mining is dangerous for surrounding village because it creates shock. They have very rich captive mines. Two mines actually they have one is morasa mines and other ones is prasanavada mines. In this mines almost all grades of limestone is available and a very little quantity of additive is to be added from outside to prepare raw-mix.
CRUSHING:
The mined limestone is hauled through Dumpers to a rotary hammer - impact type crusher that crushes the limestone to a size of 80% up to - 75 mm size. Additive material is added to the crushed limestone through an additive hopper, which bypasses the crusher.
STACKING:
The material is passed on to the stacker via belt conveyors, which stacks the material in longitudinal layers. To perform this function they have chevron-stacking stacker, which was supply by Elecon Company.
RECLAIMING:
They having end reclaim type reclaimer. The stacked material is lifted by the reclaimer, which reclaims it by cutting transversely the longitudinal stacked layers ensuring perfect blending and homogenizing. The reclaim material is transported to raw mill through belt conveyors.
RAW MILL GRINDING:
They having Atox-40 vertical roller mill. The desired material is drawn from lime stone reclaimer pile to the Box feeder and is fed to the vertical roller mill through chute. The vertical mill consists of a rotating table upon which 3 rotating rollers are hydraulically pressed. The material is dried and transported by the hot kiln exit gases. The size of the pulverized material is controlled by a static separator, which separates the oversized particles and sends it back on the table for further grinding. The pulverized material is transported to the C.F. Silo via energy efficient bucket elevators.
PROCESS IN C.F.SILO:
The pulverized material is stored and blended in the controlled flow silo. The blending action is achieved by extracting the material from the 7 outlets at a different flow rate. The extracted material is conveyed to a weighing bin were it is further blended. The operation of extraction is controlled by a PLC. The blended material is fed to the pre heater for preheating via bucket elevator.
PREHEATING:
Preheating process is done in the preheater and pre-calciner string having four stage cyclone. Approximately 40% of the total feed is given to the pre heater string where it get preheated by the hot kiln exit gases and gets calcined up to 30% approximately. The balance 60% feed is fed to the calciner string where coal is fired in the calciner and the 30% calcined feed from the pre heater string is also added to the calciner. Here, about 90% calcinations are achieved. Chemical formula of this process (at 900C) is as under:

CaCO3 CaO + CO2
900
 KILN PROCESS:
The material comes from ph and pc string is feed into the kiln where remaining 10% Calcinations process is done. This calcined feed is transferred to the kiln for the remaining 10 calcinations and sintering where the flux materials and silica melt and react with lime to form four clinker constituents. This is achieved by firing coal in the rotary kiln. Kiln capacity is 4000 TPD.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: technical schools in gujarat, msds for cement ultratech, www gujarat gurdian e paper, seminar of acpc gujarat, mi cement, satisfaction of cement, soil cement,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  vocational training report 0 649 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,305 29-02-2020, 05:48 PM
Last Post:
  Graduate engineering training 0 1,869 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,901 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 2,001 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,642 29-10-2018, 12:20 PM
Last Post: Guest
  indian railway summer training report for ee 0 1,843 23-10-2018, 02:37 PM
Last Post: Guest
  irrigation summer training report for civil engineer in pdf 3 3,283 07-10-2018, 02:00 PM
Last Post: [email protected]
  dsp winter training application form durgapur 0 1,443 01-10-2018, 04:43 PM
Last Post: Guest
  summer training report gorakhpur railway 0 1,408 29-09-2018, 03:11 PM
Last Post: Guest

Forum Jump: