Kanti Thermal Power Station also known as George Fernandes Thermal Power Plant Station(GFTPS) is located in Kanti, Muzaffarpur,90 km away from Patna, the capital of the Indian state of Bihar. It is managed by the Kanti Bijlee Utpadan Nigam Ltd. (KBUNL), a joint venture between NTPC and BSEB Patna. The majority shares of the Joint Venture Company are held by NTPC,with NTPC 64.57% and BSEB 35.43%.The plant has not been functional since 2003, however three successful trial runs have paved way for commercial production of Electricity by the end of 2013. In November 2013,Nitish Kumar said that another new 500MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2x195 MW plant in March 2015. The second unit of the 2 X 195 MW was commissioned on 13th June, 2016. Muzaffarpur Thermal Power Station is currently having an installed capacity of 610 MW. Another 500 MW extension project has also been planned.

History
First started in 1985, Kanti Power Plant has an installed capacity of 110×2 MW. An additional capacity of 195×2 MW is being erected and is due to be completed by December 2014.Bihar is the most power stricken state of India; and in the issue of uplifting our current nation, an excellent and clean 'Thermal Power station' is a necessity. Kanti thermal Power Plant came into existence in 1985 with the efforts of then MP of Muzaffarpur, George Fernandes.[8][9][10] The construction of the plant began during George's first tenure as MP of Muzaffarpur in 1978.[11] In November 2014, Kanti plant was renamed as George Fernandes Thermal Power Plant to acknowledge his contribution.

Operations
To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named ‘Vaishali Power Generating Company Limited (VPGCL)’ with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008. Present equity holding is 64.57% by NTPC & 35.43% by BSEB. The company is renovating and modernising the existing unit.The total cost of its renovation and modernization has been over Rs. 500 Crores.The station has an installed capacity of 2 X 110 MW. Both the units are under renovation and modernization. An additional capacity of 220MWx2 is being erected and is due to be completed by December 2014.In March 2013, the renovation work of two old units was completed.MTPS started commercial production from November 1, 2013 by sypplying 94 MW.This is first generation in 11 years since 2002.
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: who is george mason, kanti thermal power plant recruitment 2016, is kanti thermal power station muzaffarpur does summer treaning, kanti thermal power plant muzaffarpur bihar, http seminarprojects org t internship in kanti thermal power plant muzaffarpur pid 143400, biography of george pancham, inplan traning in kanti thermal power plant muzaffarpur bihar,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  Summer internship in verka milk plant, Amritsar 0 1,479 21-02-2023, 02:07 PM
Last Post:
  Summer internship in verka milk plant , Amritsar. 0 1,435 21-02-2023, 02:05 PM
Last Post:
  vocational training report 0 638 18-11-2020, 03:08 PM
Last Post:
  Summer training pdf 0 1,294 29-02-2020, 05:48 PM
Last Post:
  someone with pecuniary common vindication or someone who power 0 414 09-09-2019, 06:23 AM
Last Post:
  someone with economic orthodox justification or someone who power 0 555 08-09-2019, 07:20 AM
Last Post:
  Graduate engineering training 0 1,857 29-12-2018, 06:38 PM
Last Post:
  Pwd training report 0 1,891 23-11-2018, 12:40 AM
Last Post:
  pwd summer training for mechanical 0 1,989 02-11-2018, 01:06 PM
Last Post: Guest
  industrial training report on 132 33 11 k v substation 0 8,559 29-10-2018, 12:20 PM
Last Post: Guest

Forum Jump: