tuticorin thermal power station inplant training
#1
Smile 

sir,
I am Antony Kishore from tuticorin.I was doing my 2nd year B.TECH(EEE) at karunya university,coimbatore... Sir, I was very much intrested to visit our tuticorin thermal power plant as my implant training..Sir, From dec 19- jan 3 i had christmas vacation.. so on that time can i come to thermal power plant for atleast one day training..
I expect a good reply from you as soon as possible///
Reply
#2

To get full information or details of tuticorin thermal power station inplant training please have a look on the pages

http://scribddoc/77232738/Report-on-Inplant-Training#scribd

if you again feel trouble on tuticorin thermal power station inplant training please reply in that page and ask specific fields in tuticorin thermal power station inplant training
Reply

Important Note..!

If you are not satisfied with above reply ,..Please

ASK HERE

So that we will collect data for you and will made reply to the request....OR try below "QUICK REPLY" box to add a reply to this page
Popular Searches: inplant training 2013 14 in tuticorin thermal power station, mettur thermal power station eee inplant training report pdf, inplant training procedure for tuticorin thermal power station, inplant training report for thermal power station samples, how to apply for apprentice training in mettur thermal power station, tuticorin thermal power station summer training, what is the procedure to apply for an inplant training in tuticorin power planttem pdf,

[-]
Quick Reply
Message
Type your reply to this message here.

Image Verification
Please enter the text contained within the image into the text box below it. This process is used to prevent automated spam bots.
Image Verification
(case insensitive)

Possibly Related Threads...
Thread Author Replies Views Last Post
  inplant training in madurai railway station 7 4,669 06-12-2018, 10:50 AM
Last Post:
Video ppt of summer training in oil refinery of iocl mathura 1 4,730 04-12-2018, 09:27 AM
Last Post:
  solution manual of cl wadhwa power system pdf free download 8 23,442 25-11-2018, 10:48 PM
Last Post:
  dlw varanasi summer training report for electrical electronics branch 4 15,759 23-06-2018, 12:15 PM
Last Post: Guest
  source code in php for online training and placement cell management 1 6,686 23-03-2018, 09:06 AM
Last Post: ritzi
  in vijayawada thermal power plant internship details 1 1,761 21-02-2018, 07:30 PM
Last Post: Guest
  solar water purification by using thermal method pdf file 2 13,160 12-02-2018, 03:44 PM
Last Post: dhanabhagya
  seminor report on solar chimney power plant 2 1,547 08-01-2018, 04:59 AM
Last Post: Guest
  dlw varanasi summer training report for electrical electronics branch 6 13,035 06-11-2017, 10:05 AM
Last Post: jaseela123d
  power saver for industries commercial establishments 3 2,238 06-11-2017, 09:37 AM
Last Post: jaseela123d

Forum Jump: